Analysis of Traffic at Pre-Signalised Intersections(Part II )
UK China
Abstract
UK China
Abstract
The need to provide efficient public transport services in urban areas has led to the implementation of bus priority measures in many congested cities. Much interest has recently centred on priority at signal controlled junctions, including the concept of pre-signals, where traffic signals are installed at or near the end of a with-flow bus lane to provide buses with priority access to the downstream junction. Although a number of pre-signals have now been installed in the UK, particularly in London, there has been very little published research into the analysis of benefits and disbenefits to both buses and non-priority vehicles at pre-signalised intersections. This paper addresses these points through the development of analytical procedures which allow pre-implementation evaluation of specific categories of pre-signals.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The need to provide efficient public transport services in urban areas has led to the implementation of bus priority measures in many congested cities. Much interest has recently centred on priority at signal controlled junctions, including the concept of pre-signals, where traffic signals are installed at or near the end of a with-flow bus lane to provide buses with priority access to the downstream junction. Although a number of pre-signals have now been installed in the UK, particularly in London, there has been very little published research into the analysis of benefits and disbenefits to both buses and non-priority vehicles at pre-signalised intersections. This paper addresses these points through the development of analytical procedures which allow pre-implementation evaluation of specific categories of pre-signals.
Key concepts: Bus priority, Transport engineering, Computer science, Traffic flow (computer networking), Public transport, Downstream (manufacturing), Telecommunications, Engineering