1992•Transactions of the American Nuclear SocietyRequires access

Applying shutdown risk strategies to outage planning to minimize risk during shutdown outage activities

D.S. Pobst, Finley Hicks

Open publisher page 0 citations

Abstract

Shutdown risk analyses performed for U.S. and foreign nuclear power plants have suggested that accidents occurring during shutdown activities are significant contributors to a plant's overall total core damage frequency. Typically, during shutdown activities, fewer safety systems are available to mitigate the consequences of an accident. Shutdown operations also provide a greater opportunity for human error because of the numerous maintenance and operational activities that are carried out during outages and that may result in accident initiation or failure in recovering key safety systems. Risk during shutdown operations can be minimized by identifying potentially high-risk periods and ensuring that sufficient mitigation systems are readily available. Crucial to the analysis is the identification of the critical safety functions that must be maintained during shutdown operations. This paper reviews shutdown risk assessment activities associated with refueling and forced outages at the Palo Verde nuclear plant.

About this research paper

What this paper is about

Shutdown risk analyses performed for U.S. and foreign nuclear power plants have suggested that accidents occurring during shutdown activities are significant contributors to a plant's overall total core damage frequency. Typically, during shutdown activities, fewer safety systems are available to mitigate the consequences of an accident. Shutdown operations also provide a greater opportunity for human error because of the numerous maintenance and operational activities that are carried out during outages and that may result in accident initiation or failure in recovering key safety systems. Risk during shutdown operations can be minimized by identifying potentially high-risk periods and ensuring that sufficient mitigation systems are readily available. Crucial to the analysis is the identification of the critical safety functions that must be maintained during shutdown operations. This paper reviews shutdown risk assessment activities associated with refueling and forced outages at the Palo Verde nuclear plant.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Shutdown risk analyses performed for U.S. and foreign nuclear power plants have suggested that accidents occurring during shutdown activities are significant contributors to a plant's overall total core damage frequency. Typically, during shutdown activities, fewer safety systems are available to mitigate the consequences of an accident. Shutdown operations also provide a greater opportunity for human error because of the numerous maintenance and operational activities that are carried out during outages and that may result in accident initiation or failure in recovering key safety systems. Risk during shutdown operations can be minimized by identifying potentially high-risk periods and ensuring that sufficient mitigation systems are readily available. Crucial to the analysis is the identification of the critical safety functions that must be maintained during shutdown operations. This paper reviews shutdown risk assessment activities associated with refueling and forced outages at the Palo Verde nuclear plant.

Key concepts: Shutdown, Reliability engineering, Risk analysis (engineering), Risk assessment, Nuclear power, Nuclear power plant, Engineering, Identification (biology)

Related papers

Back to paper searchBrowse research topicsOriginal source
Applying shutdown risk strategies to outage planning to minimize risk during shutdown outage activities — Research Paper | ScholarLens