Topographic Survey to Know the Characteristics of the Earth Shape
Arif Roziqin, Oktavianto Gustin, Daniel Sutopo Pamungkas, Susi Indah Agustina, Gomgom Siagian
Abstract
Arif Roziqin, Oktavianto Gustin, Daniel Sutopo Pamungkas, Susi Indah Agustina, Gomgom Siagian
Abstract
The implementation of construction projects includes many stages. The initial stage in the implementation of construction projects is Earthwork. Earthwork or more commonly referred to as cut and fill is carried out due to the lack of fulfillment of the planned elevation or density of the land surface. The research method used is topographic mapping with terrestrial measurements with Total Station. The results of this study obtained topography with the lowest elevation of 24 m and the highest elevation of 59 m.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The implementation of construction projects includes many stages. The initial stage in the implementation of construction projects is Earthwork. Earthwork or more commonly referred to as cut and fill is carried out due to the lack of fulfillment of the planned elevation or density of the land surface. The research method used is topographic mapping with terrestrial measurements with Total Station. The results of this study obtained topography with the lowest elevation of 24 m and the highest elevation of 59 m.
Key concepts: Earthworks, Elevation (ballistics), Digital elevation model, Total station, Stage (stratigraphy), Geology, Remote sensing, Geodesy