Design and construction of bridge over the Hunter River near East Maitland

Catherine Sutherland, S Assi

Open publisher page 0 citations

Abstract

A 350m long bridge has been constructed over the Hunter River near East Maitland as part of Third Hunter River Crossing Project. The bridge consists of 12 spans of Super-T girders with central spans of 30m. The bridge is located in an area that is prone to major flooding and severe erosion conditions. The bridge has been designed and constructed to accommodate the geomorphology of the river which includes an actively eroding 7m high river bank and significant scour around piles. This paper describes the investigations, concept development, detailed design and construction methodology with a particular focus on aspects relating to flood design requirements.

About this research paper

What this paper is about

A 350m long bridge has been constructed over the Hunter River near East Maitland as part of Third Hunter River Crossing Project. The bridge consists of 12 spans of Super-T girders with central spans of 30m. The bridge is located in an area that is prone to major flooding and severe erosion conditions. The bridge has been designed and constructed to accommodate the geomorphology of the river which includes an actively eroding 7m high river bank and significant scour around piles. This paper describes the investigations, concept development, detailed design and construction methodology with a particular focus on aspects relating to flood design requirements.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A 350m long bridge has been constructed over the Hunter River near East Maitland as part of Third Hunter River Crossing Project. The bridge consists of 12 spans of Super-T girders with central spans of 30m. The bridge is located in an area that is prone to major flooding and severe erosion conditions. The bridge has been designed and constructed to accommodate the geomorphology of the river which includes an actively eroding 7m high river bank and significant scour around piles. This paper describes the investigations, concept development, detailed design and construction methodology with a particular focus on aspects relating to flood design requirements.

Key concepts: Bridge (graph theory), Flood myth, Flooding (psychology), Civil engineering, Erosion, Geology, Hydrology (agriculture), Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and construction of bridge over the Hunter River near East Maitland — Research Paper | ScholarLens