2019Unpublished venueRequires access

Domain Heuristics for Evolutionary Scheduling of No-Wait Flow Shops

Tsung-Su Yeh, Tsung-Che Chiang

Open publisher page 0 citations

Abstract

This paper addresses a multiobjective no-wait flow shop scheduling problem (MO-NWFSP) by a memetic algorithm (MA). The objective is to minimize makespan and maximum tardiness in a Pareto way. In the local search part of MA, we incorporate two domain heuristics into the shaking step and the neighborhood function. Before doing local search to a solution in the population, a tail-shaking operator is applied, in which we tend to move jobs with shorter total processing time to the end. During local search, we tend to adjust the processing orders of jobs whose constituted sub-sequence leads to longer machine idle time. Performance of the proposed heuristics was verified by numerical experiments on self-generated instances based on the well-known Taillard's data set. Results showed that the proposed heuristics helped to improve solution quality.

About this research paper

What this paper is about

This paper addresses a multiobjective no-wait flow shop scheduling problem (MO-NWFSP) by a memetic algorithm (MA). The objective is to minimize makespan and maximum tardiness in a Pareto way. In the local search part of MA, we incorporate two domain heuristics into the shaking step and the neighborhood function. Before doing local search to a solution in the population, a tail-shaking operator is applied, in which we tend to move jobs with shorter total processing time to the end. During local search, we tend to adjust the processing orders of jobs whose constituted sub-sequence leads to longer machine idle time. Performance of the proposed heuristics was verified by numerical experiments on self-generated instances based on the well-known Taillard's data set. Results showed that the proposed heuristics helped to improve solution quality.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper addresses a multiobjective no-wait flow shop scheduling problem (MO-NWFSP) by a memetic algorithm (MA). The objective is to minimize makespan and maximum tardiness in a Pareto way. In the local search part of MA, we incorporate two domain heuristics into the shaking step and the neighborhood function. Before doing local search to a solution in the population, a tail-shaking operator is applied, in which we tend to move jobs with shorter total processing time to the end. During local search, we tend to adjust the processing orders of jobs whose constituted sub-sequence leads to longer machine idle time. Performance of the proposed heuristics was verified by numerical experiments on self-generated instances based on the well-known Taillard's data set. Results showed that the proposed heuristics helped to improve solution quality.

Key concepts: Tardiness, Heuristics, Job shop scheduling, Flow shop scheduling, Mathematical optimization, Computer science, Local search (optimization), Pareto principle

Related papers

Back to paper searchBrowse research topicsOriginal source
Domain Heuristics for Evolutionary Scheduling of No-Wait Flow Shops — Research Paper | ScholarLens