Parallel machines with rescheduling, fixed due date, machine breakdown to reduce makespan and tardiness
V. Poongothai, P. Godhandaraman, P. Jayashri
Abstract
V. Poongothai, P. Godhandaraman, P. Jayashri
Abstract
We consider a parallel machine with rescheduling, fixed due date, machine breakdown to reduce the makespan and tardiness. If any of the jobs affected, due to the machine breakdown it will be rescheduled. Reschedule is measured by the total tardiness is based on the original makespan due date. In industry, the scheduling with fixed due dates are commonly used. In this article, a mixed integer program is formulated. The problem has been solved effectively using the Hybrid Genetic Algorithm. The performance measure has been analyzed for comparing the various types of the algorithms
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
We consider a parallel machine with rescheduling, fixed due date, machine breakdown to reduce the makespan and tardiness. If any of the jobs affected, due to the machine breakdown it will be rescheduled. Reschedule is measured by the total tardiness is based on the original makespan due date. In industry, the scheduling with fixed due dates are commonly used. In this article, a mixed integer program is formulated. The problem has been solved effectively using the Hybrid Genetic Algorithm. The performance measure has been analyzed for comparing the various types of the algorithms
Key concepts: Tardiness, Job shop scheduling, Scheduling (production processes), Computer science, Integer programming, Mathematical optimization, Genetic algorithm, Algorithm