2019Case Studies in Construction MaterialsOpen access

Accelerated bridge construction projects using high performance concrete

Amin Akhnoukh

Open full text 37 citations

Abstract

The National Bridge Inventory (NBI) of the United States includes more than 600,000 highway bridges. Approximately 25 % of the nation’s inventory is structurally deficient or functionally obsolete. Currently, the Federal Highway Administration (FHWA) is investigating different alternatives to build new bridge with longer life-span, lower maintenance, and repair needs. Currently, the FHWA is successfully using accelerated bridge construction (ABC) techniques to expedite the construction of new bridges, and minimize material, labor, and equipment cost. In this research, the ABC of new bridges using prefabricated bridge elements and systems (PBES) is discussed, including the fabrication of precast/prestressed elements using an economic high performance concrete (HPC) mix, developed using local construction materials. The successful use of HPC in fabricating PBES used in ABC techniques allows the FHWA to construct new bridges under current budget restraints. This improves the overall rating of the bridge network within the United States.

Open-access reader

About this research paper

What this paper is about

The National Bridge Inventory (NBI) of the United States includes more than 600,000 highway bridges. Approximately 25 % of the nation’s inventory is structurally deficient or functionally obsolete. Currently, the Federal Highway Administration (FHWA) is investigating different alternatives to build new bridge with longer life-span, lower maintenance, and repair needs. Currently, the FHWA is successfully using accelerated bridge construction (ABC) techniques to expedite the construction of new bridges, and minimize material, labor, and equipment cost. In this research, the ABC of new bridges using prefabricated bridge elements and systems (PBES) is discussed, including the fabrication of precast/prestressed elements using an economic high performance concrete (HPC) mix, developed using local construction materials. The successful use of HPC in fabricating PBES used in ABC techniques allows the FHWA to construct new bridges under current budget restraints. This improves the overall rating of the bridge network within the United States.

Why it matters

OpenAlex reports 37 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The National Bridge Inventory (NBI) of the United States includes more than 600,000 highway bridges. Approximately 25 % of the nation’s inventory is structurally deficient or functionally obsolete. Currently, the Federal Highway Administration (FHWA) is investigating different alternatives to build new bridge with longer life-span, lower maintenance, and repair needs. Currently, the FHWA is successfully using accelerated bridge construction (ABC) techniques to expedite the construction of new bridges, and minimize material, labor, and equipment cost. In this research, the ABC of new bridges using prefabricated bridge elements and systems (PBES) is discussed, including the fabrication of precast/prestressed elements using an economic high performance concrete (HPC) mix, developed using local construction materials. The successful use of HPC in fabricating PBES used in ABC techniques allows the FHWA to construct new bridges under current budget restraints. This improves the overall rating of the bridge network within the United States.

Key concepts: Precast concrete, Bridge (graph theory), Engineering, Prestressed concrete, Span (engineering), Civil engineering, Transport engineering, Forensic engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Accelerated bridge construction projects using high performance concrete — Research Paper | ScholarLens