Short to Medium Span Precast Prestressed Concrete Bridges in Japan
Takashi Yamane, Maher K. Tadros, P. Arumugasaamy
Abstract
Takashi Yamane, Maher K. Tadros, P. Arumugasaamy
Abstract
Nearly 40 years have elapsed since precast, prestressed concrete was first introduced to the Japanese construction industry. During this period, precast, prestressed members have been utilized mainly in bridge systems. The need for prefabricated bridges has resulted from field labor shortages in Japan. The high quality of precast, prestressed concrete makes it the material of choice for short to medium span bridges. The objective of this paper is to present the Japanese state-of-the-art of design and construction using precast, prestressed concrete girders for bridges with spans ranging from 5 to 40 m (16 to 131 ft). Four national standard girders and one regional standard girder are presented. Also included are details of diaphragms, deck bearing, bearing devices, and seismic resistant systems. Comparisons are made between Japanese and equivalent American systems relative to such factors as weight of precast members, amount of cast-in-place concrete, unit cost and design load capacity.
OpenAlex reports 22 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Nearly 40 years have elapsed since precast, prestressed concrete was first introduced to the Japanese construction industry. During this period, precast, prestressed members have been utilized mainly in bridge systems. The need for prefabricated bridges has resulted from field labor shortages in Japan. The high quality of precast, prestressed concrete makes it the material of choice for short to medium span bridges. The objective of this paper is to present the Japanese state-of-the-art of design and construction using precast, prestressed concrete girders for bridges with spans ranging from 5 to 40 m (16 to 131 ft). Four national standard girders and one regional standard girder are presented. Also included are details of diaphragms, deck bearing, bearing devices, and seismic resistant systems. Comparisons are made between Japanese and equivalent American systems relative to such factors as weight of precast members, amount of cast-in-place concrete, unit cost and design load capacity.
Key concepts: Precast concrete, Prestressed concrete, Span (engineering), Structural engineering, Engineering, Geotechnical engineering