2019International Journal of Oil Gas and Coal EngineeringOpen access

Integrated Gas Lift Completion String for Ultra-Deep Reservoir

Zhang Peng

Open full text 0 citations

Abstract

Kenjiyak Oilfield, in Kazakhstan, is an ultra-deep oil reservoir of low porosity and ultra-low permeability, causing a myriad of technical problems when produced with conventional gas lift string. To address these problems, an integrated gas lift completion string has been developed. The completion string integrates fracturing, drainage and gas lift processes, and is capable of accomplishing multiple operations of zonal fracturing, quick flowback, reservoir protection, retrieving and gas lift production, etc., in one trip. This paper introduces the structure and working principles of this string, structural and performance characteristics of the key supporting tools. Meanwhile, it analyses the retrievable gas lift mandrel and drillable-retrievable packer. 47 wells' field application showed this completion string's maximum application was 4,287.63m, the maximum working pressure was 68MPa, the maximum single well daily yield was about 130t and the average drainage duration was 3 days, presenting significant operation performances. The integrated gas lift completion string is expected to provide strong technical support for oil production with low cost and high efficiency, thereby accelerating the development of overseas oilfields.

Open-access reader

About this research paper

What this paper is about

Kenjiyak Oilfield, in Kazakhstan, is an ultra-deep oil reservoir of low porosity and ultra-low permeability, causing a myriad of technical problems when produced with conventional gas lift string. To address these problems, an integrated gas lift completion string has been developed. The completion string integrates fracturing, drainage and gas lift processes, and is capable of accomplishing multiple operations of zonal fracturing, quick flowback, reservoir protection, retrieving and gas lift production, etc., in one trip. This paper introduces the structure and working principles of this string, structural and performance characteristics of the key supporting tools. Meanwhile, it analyses the retrievable gas lift mandrel and drillable-retrievable packer. 47 wells' field application showed this completion string's maximum application was 4,287.63m, the maximum working pressure was 68MPa, the maximum single well daily yield was about 130t and the average drainage duration was 3 days, presenting significant operation performances. The integrated gas lift completion string is expected to provide strong technical support for oil production with low cost and high efficiency, thereby accelerating the development of overseas oilfields.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Kenjiyak Oilfield, in Kazakhstan, is an ultra-deep oil reservoir of low porosity and ultra-low permeability, causing a myriad of technical problems when produced with conventional gas lift string. To address these problems, an integrated gas lift completion string has been developed. The completion string integrates fracturing, drainage and gas lift processes, and is capable of accomplishing multiple operations of zonal fracturing, quick flowback, reservoir protection, retrieving and gas lift production, etc., in one trip. This paper introduces the structure and working principles of this string, structural and performance characteristics of the key supporting tools. Meanwhile, it analyses the retrievable gas lift mandrel and drillable-retrievable packer. 47 wells' field application showed this completion string's maximum application was 4,287.63m, the maximum working pressure was 68MPa, the maximum single well daily yield was about 130t and the average drainage duration was 3 days, presenting significant operation performances. The integrated gas lift completion string is expected to provide strong technical support for oil production with low cost and high efficiency, thereby accelerating the development of overseas oilfields.

Key concepts: Gas lift, Completion (oil and gas wells), Petroleum engineering, Lift (data mining), Natural gas field, String (physics), Mandrel, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Integrated Gas Lift Completion String for Ultra-Deep Reservoir — Research Paper | ScholarLens