1984SPE Annual Technical Conference and ExhibitionRequires access

Deep Sucker Rod Pumping for Gas Well Unloading

L. J. Henderson

Open publisher page 4 citations

Abstract

ABSTRACT Exxon Company, U.S.A.'s Pyote Gas Unit 14-1 in the Block 16 (Ellenburger) field became the world's deepest rod pumped well on October 7, 1983. The rod pump was installed at 16,850 ft. in an attempt to extend the productive life of the well. The artificial lift system was designed to lift wellbore fluid that was restricting the flow of gas, thus allowing the gas to be produced up the tubing-casing annulus. Implementation of the project was possible because of the recent improvements in predictive techniques, materials available for rod pumping, and industry's experience in artificial lift.

About this research paper

What this paper is about

ABSTRACT Exxon Company, U.S.A.'s Pyote Gas Unit 14-1 in the Block 16 (Ellenburger) field became the world's deepest rod pumped well on October 7, 1983. The rod pump was installed at 16,850 ft. in an attempt to extend the productive life of the well. The artificial lift system was designed to lift wellbore fluid that was restricting the flow of gas, thus allowing the gas to be produced up the tubing-casing annulus. Implementation of the project was possible because of the recent improvements in predictive techniques, materials available for rod pumping, and industry's experience in artificial lift.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

ABSTRACT Exxon Company, U.S.A.'s Pyote Gas Unit 14-1 in the Block 16 (Ellenburger) field became the world's deepest rod pumped well on October 7, 1983. The rod pump was installed at 16,850 ft. in an attempt to extend the productive life of the well. The artificial lift system was designed to lift wellbore fluid that was restricting the flow of gas, thus allowing the gas to be produced up the tubing-casing annulus. Implementation of the project was possible because of the recent improvements in predictive techniques, materials available for rod pumping, and industry's experience in artificial lift.

Key concepts: Artificial lift, Sucker rod, Gas lift, Casing, Annulus (botany), Coiled tubing, Petroleum engineering, Wellbore

Related papers

Back to paper searchBrowse research topicsOriginal source
Deep Sucker Rod Pumping for Gas Well Unloading — Research Paper | ScholarLens