Structural evaluation of rubblized concrete pavements in Iowa

Hali̇l Ceylan, Kasthurirangan Gopalakrishnan, Sung-Jin Kim

Open publisher page 2 citations

Abstract

Rubblization is one of the surface preparation techniques before placing a Hot Mix Asphalt (HMA) overlay that involves breaking the Portland Cement Concrete (PCC) pavement into pieces. This paper describes the structural assessment related to the long term performance of rubblized concrete pavements in Iowa. The structural performance of seven representative in-service rubblized concrete pavement sections across Iowa were evaluated through Falling Weight Deflectometer (FWD) and Dynamic Cone Penetrometer (DCP) tests, and visual pavement distress surveys. Through backcalculation of FWD deflection data using the Iowa State University (ISU) layer moduli backcalculation program, the pavement layer moduli values were determined and were correlated with the long-term pavement performance. The backcalculated subgrade modulus values were also compared with the subgrade modulus values obtained from DCP test results. The results indicate that the rubblized pavement sections in Iowa are performing very well. It is recommended that the rubblized pavements be frequently monitored to gain a better understanding of their long-term performance.

About this research paper

What this paper is about

Rubblization is one of the surface preparation techniques before placing a Hot Mix Asphalt (HMA) overlay that involves breaking the Portland Cement Concrete (PCC) pavement into pieces. This paper describes the structural assessment related to the long term performance of rubblized concrete pavements in Iowa. The structural performance of seven representative in-service rubblized concrete pavement sections across Iowa were evaluated through Falling Weight Deflectometer (FWD) and Dynamic Cone Penetrometer (DCP) tests, and visual pavement distress surveys. Through backcalculation of FWD deflection data using the Iowa State University (ISU) layer moduli backcalculation program, the pavement layer moduli values were determined and were correlated with the long-term pavement performance. The backcalculated subgrade modulus values were also compared with the subgrade modulus values obtained from DCP test results. The results indicate that the rubblized pavement sections in Iowa are performing very well. It is recommended that the rubblized pavements be frequently monitored to gain a better understanding of their long-term performance.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Rubblization is one of the surface preparation techniques before placing a Hot Mix Asphalt (HMA) overlay that involves breaking the Portland Cement Concrete (PCC) pavement into pieces. This paper describes the structural assessment related to the long term performance of rubblized concrete pavements in Iowa. The structural performance of seven representative in-service rubblized concrete pavement sections across Iowa were evaluated through Falling Weight Deflectometer (FWD) and Dynamic Cone Penetrometer (DCP) tests, and visual pavement distress surveys. Through backcalculation of FWD deflection data using the Iowa State University (ISU) layer moduli backcalculation program, the pavement layer moduli values were determined and were correlated with the long-term pavement performance. The backcalculated subgrade modulus values were also compared with the subgrade modulus values obtained from DCP test results. The results indicate that the rubblized pavement sections in Iowa are performing very well. It is recommended that the rubblized pavements be frequently monitored to gain a better understanding of their long-term performance.

Key concepts: Forensic engineering, Engineering, Civil engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Structural evaluation of rubblized concrete pavements in Iowa — Research Paper | ScholarLens