BRIDGE JACKING TO THE RESCUE
P.J.A. Sharland
Abstract
P.J.A. Sharland
Abstract
A project that was on and off the drawing board for 12 years was finally completed in November '91. A 1200 ton concrete box structure was successfully jacked into place under live rail tracks near Durban to enable development of a piece of industrial ground.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A project that was on and off the drawing board for 12 years was finally completed in November '91. A 1200 ton concrete box structure was successfully jacked into place under live rail tracks near Durban to enable development of a piece of industrial ground.
Key concepts: Jacking, Bridge (graph theory), Engineering, Forensic engineering, Civil engineering, Construction engineering, History, Art history