Abstract This paper describes a recent Directional Coiled Tubing Drilling (DCTD) job that was completed for an independent operator in the Appalachian Basin. The objective was to access target zones identified adjacent to a recently drilled, vertical well using a lateral sidetrack. The target thickness was around 15ft so accurate depth control was critical. It was also considered essential that the entire reservoir section be drilled underbalanced to minimise formation damage. The challenge was to deliver a productive horizontal sidetrack in an effective and cost-efficient manner. The field development strategy required costs to be kept to a minimum, but the use of high-tech equipment was essential to delivering the production improvements. A 3.2 inch DCTD Bottom Hole Assembly (BHA) and a specialised DCTD engineering software package were enabling technologies. A multi-disciplinary approach was adopted to plan and execute the sidetrack. This approach required inputs to the planning process from all stages in delivering the well, which included: 3D seismic, well trajectory planning, drilling engineering, completions. This project was ultimately successful in that a dry hole was re-entered and sidetracked to create a productive well, thereby validating the technology and multi-disciplinary approach of the team. The lessons learned from this operation can be used to optimise the planning of future wells and maximise the value of re-entering marginal wells and fields.

About this research paper

What this paper is about

Abstract This paper describes a recent Directional Coiled Tubing Drilling (DCTD) job that was completed for an independent operator in the Appalachian Basin. The objective was to access target zones identified adjacent to a recently drilled, vertical well using a lateral sidetrack. The target thickness was around 15ft so accurate depth control was critical. It was also considered essential that the entire reservoir section be drilled underbalanced to minimise formation damage. The challenge was to deliver a productive horizontal sidetrack in an effective and cost-efficient manner. The field development strategy required costs to be kept to a minimum, but the use of high-tech equipment was essential to delivering the production improvements. A 3.2 inch DCTD Bottom Hole Assembly (BHA) and a specialised DCTD engineering software package were enabling technologies. A multi-disciplinary approach was adopted to plan and execute the sidetrack. This approach required inputs to the planning process from all stages in delivering the well, which included: 3D seismic, well trajectory planning, drilling engineering, completions. This project was ultimately successful in that a dry hole was re-entered and sidetracked to create a productive well, thereby validating the technology and multi-disciplinary approach of the team. The lessons learned from this operation can be used to optimise the planning of future wells and maximise the value of re-entering marginal wells and fields.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract This paper describes a recent Directional Coiled Tubing Drilling (DCTD) job that was completed for an independent operator in the Appalachian Basin. The objective was to access target zones identified adjacent to a recently drilled, vertical well using a lateral sidetrack. The target thickness was around 15ft so accurate depth control was critical. It was also considered essential that the entire reservoir section be drilled underbalanced to minimise formation damage. The challenge was to deliver a productive horizontal sidetrack in an effective and cost-efficient manner. The field development strategy required costs to be kept to a minimum, but the use of high-tech equipment was essential to delivering the production improvements. A 3.2 inch DCTD Bottom Hole Assembly (BHA) and a specialised DCTD engineering software package were enabling technologies. A multi-disciplinary approach was adopted to plan and execute the sidetrack. This approach required inputs to the planning process from all stages in delivering the well, which included: 3D seismic, well trajectory planning, drilling engineering, completions. This project was ultimately successful in that a dry hole was re-entered and sidetracked to create a productive well, thereby validating the technology and multi-disciplinary approach of the team. The lessons learned from this operation can be used to optimise the planning of future wells and maximise the value of re-entering marginal wells and fields.

Key concepts: Drilling, Completion (oil and gas wells), Engineering, Coiled tubing, Process (computing), Petroleum engineering, Mechanical engineering, Computer science