2012•SPE Annual Technical Conference and ExhibitionRequires access

Case Study: Completion Design and Operation in High Dogleg Coiled Tubing Drilling Wells

Nurul Ezalina Hamzah, A. A. Abdul Rahman, Nurfaridah Ahmad Fauzi, T. Morris, Z. Ibrahim, John Rizal Jenie, Youssef Chaari

Open publisher page 3 citations

Abstract

Abstract Completion operation is one of the most important contributors to successful well deliverables. Without a proper design of the accessories and efficient operation in conveying the completion assembly, the true potential of a well may not be realized. Coiled Tubing Drilling (CTD) was first attempted in Peninsular Malaysia in February 2011 and the wells were designed to be completed as Coiled Tubing (CT) re-entry sidetrack using 2-3/8" pre-drilled liner and swell packers with maximum inclination of 90° angle and dogleg ranges between 30-60° per 100 feet. The liner and swell packer assembly were designed to be conveyed to the target zone via coiled tubing and to go through 3 ½" tubing with maximum clearance of 2.8" and dual casing exit from the existing completion setup. Apart from the small and rigid clearance, another challenges that the team faced was differential sticking due to mud property that was used to maintain hole stability and to prevent the hole from collapsing before the completion was placed. Since the completion would be conveyed through high dogleg environment, the type of liner and swell packer chosen had to able to withstand the bending stresses applied to it. A small error will result in parted assembly or inability for it to be conveyed all the way to the intended zone. This paper presents the challenges faced during the design and completion operations and discusses the program devised to overcome the above mentioned issues. Based on the lesson learnt from previous wells in which the operations were not 100% successful, the team made significant improvements in terms of mud property, swell packer design, procedure changes and introduction of friction reducer into the completion program of the final and last well of the campaign that finally enabled the liner to be conveyed to the total depth (TD) successfully.

About this research paper

What this paper is about

Abstract Completion operation is one of the most important contributors to successful well deliverables. Without a proper design of the accessories and efficient operation in conveying the completion assembly, the true potential of a well may not be realized. Coiled Tubing Drilling (CTD) was first attempted in Peninsular Malaysia in February 2011 and the wells were designed to be completed as Coiled Tubing (CT) re-entry sidetrack using 2-3/8" pre-drilled liner and swell packers with maximum inclination of 90° angle and dogleg ranges between 30-60° per 100 feet. The liner and swell packer assembly were designed to be conveyed to the target zone via coiled tubing and to go through 3 ½" tubing with maximum clearance of 2.8" and dual casing exit from the existing completion setup. Apart from the small and rigid clearance, another challenges that the team faced was differential sticking due to mud property that was used to maintain hole stability and to prevent the hole from collapsing before the completion was placed. Since the completion would be conveyed through high dogleg environment, the type of liner and swell packer chosen had to able to withstand the bending stresses applied to it. A small error will result in parted assembly or inability for it to be conveyed all the way to the intended zone. This paper presents the challenges faced during the design and completion operations and discusses the program devised to overcome the above mentioned issues. Based on the lesson learnt from previous wells in which the operations were not 100% successful, the team made significant improvements in terms of mud property, swell packer design, procedure changes and introduction of friction reducer into the completion program of the final and last well of the campaign that finally enabled the liner to be conveyed to the total depth (TD) successfully.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Completion operation is one of the most important contributors to successful well deliverables. Without a proper design of the accessories and efficient operation in conveying the completion assembly, the true potential of a well may not be realized. Coiled Tubing Drilling (CTD) was first attempted in Peninsular Malaysia in February 2011 and the wells were designed to be completed as Coiled Tubing (CT) re-entry sidetrack using 2-3/8" pre-drilled liner and swell packers with maximum inclination of 90° angle and dogleg ranges between 30-60° per 100 feet. The liner and swell packer assembly were designed to be conveyed to the target zone via coiled tubing and to go through 3 ½" tubing with maximum clearance of 2.8" and dual casing exit from the existing completion setup. Apart from the small and rigid clearance, another challenges that the team faced was differential sticking due to mud property that was used to maintain hole stability and to prevent the hole from collapsing before the completion was placed. Since the completion would be conveyed through high dogleg environment, the type of liner and swell packer chosen had to able to withstand the bending stresses applied to it. A small error will result in parted assembly or inability for it to be conveyed all the way to the intended zone. This paper presents the challenges faced during the design and completion operations and discusses the program devised to overcome the above mentioned issues. Based on the lesson learnt from previous wells in which the operations were not 100% successful, the team made significant improvements in terms of mud property, swell packer design, procedure changes and introduction of friction reducer into the completion program of the final and last well of the campaign that finally enabled the liner to be conveyed to the total depth (TD) successfully.

Key concepts: Coiled tubing, Completion (oil and gas wells), Drilling, Casing, Deliverable, Swell, Petroleum engineering, Engineering