2018•Mathematical Problems in EngineeringOpen access

Study on the Rectification of Forebay in Pumping Station

Weiwei Song, Yong Pang, Xiaohuan Shi, Qing Xu

Open full text 26 citations

Abstract

The forebay of pumping stations is an important hydraulic structure that connects the channel with the inlet channel. Actual test observations and theoretical studies have shown that poor precursors produce backflow, vortex, and water flow disturbances in the forebay water. In this paper, taking a lateral inlet pump station as an example, we study the nonmeasures and five rectification measures—“Y” type diversion pier, “T” shaped diversion pier, narrow bottom hole, high and wide bottom, and diversion wall—through adopting the method of numerical simulation and model test. For the numerical simulation, the corresponding three-dimensional model is established by UG solid modeling software, and then the computational fluid is simulated numerically with CFX. Based on the analysis and comparison of the results during the test of numerical simulation and model test, the stability of the rectification measures is considered after taking into consideration the results of the uniformity test of the velocity distribution of the surface layer, the bottom layer, and the front section of each scheme. The proposed scheme 3 (“T” diversion pier) is regarded as the pumping station flow control measures.

Open-access reader

About this research paper

What this paper is about

The forebay of pumping stations is an important hydraulic structure that connects the channel with the inlet channel. Actual test observations and theoretical studies have shown that poor precursors produce backflow, vortex, and water flow disturbances in the forebay water. In this paper, taking a lateral inlet pump station as an example, we study the nonmeasures and five rectification measures—“Y” type diversion pier, “T” shaped diversion pier, narrow bottom hole, high and wide bottom, and diversion wall—through adopting the method of numerical simulation and model test. For the numerical simulation, the corresponding three-dimensional model is established by UG solid modeling software, and then the computational fluid is simulated numerically with CFX. Based on the analysis and comparison of the results during the test of numerical simulation and model test, the stability of the rectification measures is considered after taking into consideration the results of the uniformity test of the velocity distribution of the surface layer, the bottom layer, and the front section of each scheme. The proposed scheme 3 (“T” diversion pier) is regarded as the pumping station flow control measures.

Why it matters

OpenAlex reports 26 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The forebay of pumping stations is an important hydraulic structure that connects the channel with the inlet channel. Actual test observations and theoretical studies have shown that poor precursors produce backflow, vortex, and water flow disturbances in the forebay water. In this paper, taking a lateral inlet pump station as an example, we study the nonmeasures and five rectification measures—“Y” type diversion pier, “T” shaped diversion pier, narrow bottom hole, high and wide bottom, and diversion wall—through adopting the method of numerical simulation and model test. For the numerical simulation, the corresponding three-dimensional model is established by UG solid modeling software, and then the computational fluid is simulated numerically with CFX. Based on the analysis and comparison of the results during the test of numerical simulation and model test, the stability of the rectification measures is considered after taking into consideration the results of the uniformity test of the velocity distribution of the surface layer, the bottom layer, and the front section of each scheme. The proposed scheme 3 (“T” diversion pier) is regarded as the pumping station flow control measures.

Key concepts: Backflow, Inlet, Pier, Computer simulation, Rectification, Channel (broadcasting), Flow (mathematics), Mechanics

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on the Rectification of Forebay in Pumping Station — Research Paper | ScholarLens