2017•CERN Document Server (European Organization for Nuclear Research)Open access

Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test

Federico Roncarolo, Allica Santamaria, Juan, Michele Bozzolan, Chiara Bracco, Stephane Burger, Gerrit Jan Focker, G. Guidoboni, Thomas Hofmann, Lars Kock Jensen, Bettina Mikulec, Navarro Fernandez, Araceli, U. Raich, Julien-Benjamin Ruiz, Lars Søby, Jocelyn Tan, William Viganó, C. Vuitton, C. Zamantzas

Open full text 1 citations

Abstract

The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems that are essential to monitor, control and optimize the beam parameters. A general overview of the installed systems and their functional specifications will be followed by a summary of the most relevant results. This includes transverse profile monitors (wire scanners, wire grids and a laser profile monitor), beam position and phase monitors (whose ToF measurements were essential for adjusting RF cavity parameters), beam loss monitors, beam current transformers and longitudinal beam shape monitors. This contribution will also cover the beam instrumentation for the so-called PSB Half Sector Test, which has been temporarily installed in the LINAC4 transfer line to study H⁻ stripping efficiency. At this facility it was possible to test the new H⁰/H⁻ beam current monitor, designed to monitor the stripping efficiency and an essential element of the beam interlock system when the LINAC4 is connected to the PSB in 2019.

Open-access reader

About this research paper

What this paper is about

The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems that are essential to monitor, control and optimize the beam parameters. A general overview of the installed systems and their functional specifications will be followed by a summary of the most relevant results. This includes transverse profile monitors (wire scanners, wire grids and a laser profile monitor), beam position and phase monitors (whose ToF measurements were essential for adjusting RF cavity parameters), beam loss monitors, beam current transformers and longitudinal beam shape monitors. This contribution will also cover the beam instrumentation for the so-called PSB Half Sector Test, which has been temporarily installed in the LINAC4 transfer line to study H⁻ stripping efficiency. At this facility it was possible to test the new H⁰/H⁻ beam current monitor, designed to monitor the stripping efficiency and an essential element of the beam interlock system when the LINAC4 is connected to the PSB in 2019.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems that are essential to monitor, control and optimize the beam parameters. A general overview of the installed systems and their functional specifications will be followed by a summary of the most relevant results. This includes transverse profile monitors (wire scanners, wire grids and a laser profile monitor), beam position and phase monitors (whose ToF measurements were essential for adjusting RF cavity parameters), beam loss monitors, beam current transformers and longitudinal beam shape monitors. This contribution will also cover the beam instrumentation for the so-called PSB Half Sector Test, which has been temporarily installed in the LINAC4 transfer line to study H⁻ stripping efficiency. At this facility it was possible to test the new H⁰/H⁻ beam current monitor, designed to monitor the stripping efficiency and an essential element of the beam interlock system when the LINAC4 is connected to the PSB in 2019.

Key concepts: Instrumentation (computer programming), Large Hadron Collider, Beam (structure), Physics, Nuclear engineering, Nuclear physics, Engineering, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test — Research Paper | ScholarLens