Commissioning of CERN LINAC4
Alessandra Lombardi
Abstract
Open-access reader
Alessandra Lombardi
Abstract
Open-access reader
This talk reviews the commissioning effort of CERN's new H⁻ linear accelerator, Linac4, which is presently undergoing a beam quality and reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the 50MeV proton Linac2.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This talk reviews the commissioning effort of CERN's new H⁻ linear accelerator, Linac4, which is presently undergoing a beam quality and reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the 50MeV proton Linac2.
Key concepts: Project commissioning, Political science, Law, Publishing