2017Unpublished venueRequires access

The calculation method research for transportation capacity release value of existing line after high-speed railway's operation

Zhang Luyu, Feng Xiaoyan

Open publisher page 0 citations

Abstract

With the high-speed railway put into operation, the types of trains in the existed line is reduced, train intervals will also be shortened. We analyze the impact of high-speed rail's operations on the basis of the calculation method of the interval passing capacity in existed line, for example in three major areas : the difference of train running time in the section, the proportion of trains dispatched in succession, the change of train tracking interval. From the definition of the removal coefficient calculation, we calculate the existing railway single line and double line transport capacity after release.

About this research paper

What this paper is about

With the high-speed railway put into operation, the types of trains in the existed line is reduced, train intervals will also be shortened. We analyze the impact of high-speed rail's operations on the basis of the calculation method of the interval passing capacity in existed line, for example in three major areas : the difference of train running time in the section, the proportion of trains dispatched in succession, the change of train tracking interval. From the definition of the removal coefficient calculation, we calculate the existing railway single line and double line transport capacity after release.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

With the high-speed railway put into operation, the types of trains in the existed line is reduced, train intervals will also be shortened. We analyze the impact of high-speed rail's operations on the basis of the calculation method of the interval passing capacity in existed line, for example in three major areas : the difference of train running time in the section, the proportion of trains dispatched in succession, the change of train tracking interval. From the definition of the removal coefficient calculation, we calculate the existing railway single line and double line transport capacity after release.

Key concepts: Train, Interval (graph theory), Line (geometry), Railway line, Rail transportation, Computer science, Tracking (education), Section (typography)

Related papers

Back to paper searchBrowse research topicsOriginal source
The calculation method research for transportation capacity release value of existing line after high-speed railway's operation — Research Paper | ScholarLens