The Impact of Delays of Freight Trains in JIT System on Example One Track Line

Matúš Dlugoš, Lumír Pečený, Pavol Meško, Peter Šulko

Open full text 7 citations

Abstract

The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive in just in time system, it means, that shipments are delivered at exact time and place on time. At this line there are many problems not only this track line is single track, so it is necessary to cross the trains very often in traffic points which maximum 2 traffic tracks but also organizing of transport is more complicated which is provided by Railway infrastructure manager – this case is very important example when railway traffic technology slows down all processes in the logistic chain.

About this research paper

What this paper is about

The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive in just in time system, it means, that shipments are delivered at exact time and place on time. At this line there are many problems not only this track line is single track, so it is necessary to cross the trains very often in traffic points which maximum 2 traffic tracks but also organizing of transport is more complicated which is provided by Railway infrastructure manager – this case is very important example when railway traffic technology slows down all processes in the logistic chain.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive in just in time system, it means, that shipments are delivered at exact time and place on time. At this line there are many problems not only this track line is single track, so it is necessary to cross the trains very often in traffic points which maximum 2 traffic tracks but also organizing of transport is more complicated which is provided by Railway infrastructure manager – this case is very important example when railway traffic technology slows down all processes in the logistic chain.

Key concepts: Train, Track (disk drive), Freight trains, Line (geometry), Transport engineering, Railway line, Computer science, Rail freight transport