High-Grade Concrete for the Single Permanent Shotcrete Lining Method

Wolfgang Kusterle, W. Lukas

Open publisher page 0 citations

Abstract

With the single permanent shotcrete lining method in underground construction in rock, a shotcrete layer placed subsequently to the application of the supporting shotcrete replaces the cast in-situ inner lining. As a general rule, this layer is placed on the supporting shotcrete after the deformations have faded. Because of the firm bond of the shotcrete layers, their interaction in the sense of a bonded construction is ensured. The excavation section and the concrete consumption are reduced. Formwork is no longer required. With the composition of the shotcrete and the placing technique employed in former tests, it was difficult to fully incorporate any necessary reinforcement and to produce dense high-grade shotcrete.

About this research paper

What this paper is about

With the single permanent shotcrete lining method in underground construction in rock, a shotcrete layer placed subsequently to the application of the supporting shotcrete replaces the cast in-situ inner lining. As a general rule, this layer is placed on the supporting shotcrete after the deformations have faded. Because of the firm bond of the shotcrete layers, their interaction in the sense of a bonded construction is ensured. The excavation section and the concrete consumption are reduced. Formwork is no longer required. With the composition of the shotcrete and the placing technique employed in former tests, it was difficult to fully incorporate any necessary reinforcement and to produce dense high-grade shotcrete.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

With the single permanent shotcrete lining method in underground construction in rock, a shotcrete layer placed subsequently to the application of the supporting shotcrete replaces the cast in-situ inner lining. As a general rule, this layer is placed on the supporting shotcrete after the deformations have faded. Because of the firm bond of the shotcrete layers, their interaction in the sense of a bonded construction is ensured. The excavation section and the concrete consumption are reduced. Formwork is no longer required. With the composition of the shotcrete and the placing technique employed in former tests, it was difficult to fully incorporate any necessary reinforcement and to produce dense high-grade shotcrete.

Key concepts: Shotcrete, Formwork, Geotechnical engineering, Excavation, Reinforcement, Geology, Engineering, Structural engineering