2014American journal of environmental engineeringOpen access

Upgrading of a Reinforced Concrete Road Bridge

Janusz Hołowaty

Open full text 1 citations

Abstract

The upgrading of an existing older RC bridge located on a trunk road in a county town is described. The bridge was built at the end of the 1940s and was substandard due to its low capacity and lack of pedestrian sidewalks. The location of the bridge on a national highway required the introduction of a higher level of safety and load capacity for further service life. The bridge needed to be strengthened and widened. The existing span was used as a core element for an additional new, widened upper reinforced concrete overslab and strengthening reinforcement bars with shotcrete at the bottom of the span. The added top concrete overslab was made continuous with the abutments, and the bridge became integral. The bridge load bearing capacity was increased to the highest loading class in Poland. The paper describes the structural issues related to widening and strengthening the structure associated with the arrangement of the wider deck and introduction of the new sidewalks.

About this research paper

What this paper is about

The upgrading of an existing older RC bridge located on a trunk road in a county town is described. The bridge was built at the end of the 1940s and was substandard due to its low capacity and lack of pedestrian sidewalks. The location of the bridge on a national highway required the introduction of a higher level of safety and load capacity for further service life. The bridge needed to be strengthened and widened. The existing span was used as a core element for an additional new, widened upper reinforced concrete overslab and strengthening reinforcement bars with shotcrete at the bottom of the span. The added top concrete overslab was made continuous with the abutments, and the bridge became integral. The bridge load bearing capacity was increased to the highest loading class in Poland. The paper describes the structural issues related to widening and strengthening the structure associated with the arrangement of the wider deck and introduction of the new sidewalks.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The upgrading of an existing older RC bridge located on a trunk road in a county town is described. The bridge was built at the end of the 1940s and was substandard due to its low capacity and lack of pedestrian sidewalks. The location of the bridge on a national highway required the introduction of a higher level of safety and load capacity for further service life. The bridge needed to be strengthened and widened. The existing span was used as a core element for an additional new, widened upper reinforced concrete overslab and strengthening reinforcement bars with shotcrete at the bottom of the span. The added top concrete overslab was made continuous with the abutments, and the bridge became integral. The bridge load bearing capacity was increased to the highest loading class in Poland. The paper describes the structural issues related to widening and strengthening the structure associated with the arrangement of the wider deck and introduction of the new sidewalks.

Key concepts: Bridge (graph theory), Structural engineering, Span (engineering), Engineering, Deck, Abutment, Forensic engineering, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Upgrading of a Reinforced Concrete Road Bridge — Research Paper | ScholarLens