2016Unpublished venueRequires access

An Application of Value Stream Mapping in Production Flow Analysis: A lean approach in An Automotive Industry

Krushnaraj Bodana, Bimal Kumar Mawandiya, Kaushik M. Patel, Bharat Modi

Open publisher page 2 citations

Abstract

Lean manufacturing deals with a manufacturing process improvement based on the fundamental goal of Toyota production system in order to minimize or eliminate waste while maximizing production flow. Today in a highly competitive local and global market, it is very much crucial to satisfy the changing demand of the customers. Thus, in today’s manufacturing industry there is an increased focus to produce the right product at right time. The prime objective of this paper to apply a significant lean manufacturing tool know as Value Stream Mapping (VSM). To fulfil this objective a fundamental principles of lean were implemented and VSM was generated to analyse the production flow at an automotive industry and improve the current operating condition to overcome the difficulties with current state of work through time study, Takt time calculation, modifying work cell layout. And based on the future state of VSM, final results showed that by implementing this lean techniques, Production Lead-time (PLT) decreased from 7.6 days to 3.2 days, and the cycle time is decrease up to 73%.

About this research paper

What this paper is about

Lean manufacturing deals with a manufacturing process improvement based on the fundamental goal of Toyota production system in order to minimize or eliminate waste while maximizing production flow. Today in a highly competitive local and global market, it is very much crucial to satisfy the changing demand of the customers. Thus, in today’s manufacturing industry there is an increased focus to produce the right product at right time. The prime objective of this paper to apply a significant lean manufacturing tool know as Value Stream Mapping (VSM). To fulfil this objective a fundamental principles of lean were implemented and VSM was generated to analyse the production flow at an automotive industry and improve the current operating condition to overcome the difficulties with current state of work through time study, Takt time calculation, modifying work cell layout. And based on the future state of VSM, final results showed that by implementing this lean techniques, Production Lead-time (PLT) decreased from 7.6 days to 3.2 days, and the cycle time is decrease up to 73%.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Lean manufacturing deals with a manufacturing process improvement based on the fundamental goal of Toyota production system in order to minimize or eliminate waste while maximizing production flow. Today in a highly competitive local and global market, it is very much crucial to satisfy the changing demand of the customers. Thus, in today’s manufacturing industry there is an increased focus to produce the right product at right time. The prime objective of this paper to apply a significant lean manufacturing tool know as Value Stream Mapping (VSM). To fulfil this objective a fundamental principles of lean were implemented and VSM was generated to analyse the production flow at an automotive industry and improve the current operating condition to overcome the difficulties with current state of work through time study, Takt time calculation, modifying work cell layout. And based on the future state of VSM, final results showed that by implementing this lean techniques, Production Lead-time (PLT) decreased from 7.6 days to 3.2 days, and the cycle time is decrease up to 73%.

Key concepts: Value stream mapping, Lean manufacturing, Automotive industry, Manufacturing engineering, Lead time, Toyota Production System, Production (economics), Lean laboratory

Related papers

Back to paper searchBrowse research topicsOriginal source
An Application of Value Stream Mapping in Production Flow Analysis: A lean approach in An Automotive Industry — Research Paper | ScholarLens