Application of lean manufacturing in automotive manufacturing unit
Jagmeet Singh, Harwinder Singh
Abstract
Jagmeet Singh, Harwinder Singh
Abstract
Purpose This paper aims to apply lean manufacturing using value stream mapping (VSM) in the manufacturing organization (automotive suspension and fastening components section). To validate the VSM approach, simulation has been done. Design/methodology/approach VSM approach has been used to implement lean stages in the U-bolt section. Current state map was prepared and future state map has been implemented. Further, simulation has been done to compare current state and future state maps. Findings It has been found that there is 87.59% reduction in cycle time (C/T), 76.47% reduction in work-in-process (WIP) inventory, 95.41% reduction in production lead time, 66.08% increase in value added (VA) ratio, 95.78% reduction in non-value added (NVA) time, 57.14% reduction in the number of operators and 70.67% reduction in change over (C/O) time for the U-bolt section. Simulated and VSM of current and future state has observed error of 5 s. Research limitations/implications This study is based on automotive manufacturing industry situated in northern part of India. The outcome of this study is applicable only to the selected product of the manufacturing company. Originality/value This paper deals with case study part which reflects the true picture of implementation of Lean manufacturing (LM) tools in the organization.
OpenAlex reports 46 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Purpose This paper aims to apply lean manufacturing using value stream mapping (VSM) in the manufacturing organization (automotive suspension and fastening components section). To validate the VSM approach, simulation has been done. Design/methodology/approach VSM approach has been used to implement lean stages in the U-bolt section. Current state map was prepared and future state map has been implemented. Further, simulation has been done to compare current state and future state maps. Findings It has been found that there is 87.59% reduction in cycle time (C/T), 76.47% reduction in work-in-process (WIP) inventory, 95.41% reduction in production lead time, 66.08% increase in value added (VA) ratio, 95.78% reduction in non-value added (NVA) time, 57.14% reduction in the number of operators and 70.67% reduction in change over (C/O) time for the U-bolt section. Simulated and VSM of current and future state has observed error of 5 s. Research limitations/implications This study is based on automotive manufacturing industry situated in northern part of India. The outcome of this study is applicable only to the selected product of the manufacturing company. Originality/value This paper deals with case study part which reflects the true picture of implementation of Lean manufacturing (LM) tools in the organization.
Key concepts: Value stream mapping, Automotive industry, Lean manufacturing, Lead time, Manufacturing engineering, Reduction (mathematics), Engineering, Process (computing)