2017Transportation Research Record Journal of the Transportation Research BoardRequires access

Roles and Responsibilities of Independent Cost Estimator in Construction Manager–General Contractor Highway Construction

Douglas Alleman, Richard B. Duval, Keith R. Molenaar

Open publisher page 5 citations

Abstract

The use of construction manager–general contractor (CM-GC) project delivery is gaining momentum with highway projects across the United States. This project delivery process is different from the traditional design–bid–build (D-B-B) process in that an agency works with one CM-GC to develop the construction cost. To ensure that agencies receive fair market value, many agencies employ an independent cost estimator (ICE) in lieu of competitive bidding. The findings of a research effort to explore ICE roles, responsibilities, and best practices within highway construction are presented. The findings were derived through a review of previous literature, current agency CM-GC ICE policies, surveys of 25 completed CM-GC projects, and in-depth interviews with highway agency officials on six of the projects. The six projects were selected for interviews from the set of completed projects to allow for cross-case comparison. Although multiple best practices are identified, the two key findings of the research are that the ICE should have construction experience and local knowledge and should be an involved team member throughout the design process. In summary, all of the reviewed agencies found the ICE role to be essential in establishing a competitive construction contract cost and thereby gaining value through early contractor involvement. Some agencies found that the ICE added value beyond the costing process as a team member throughout design, but this practice was not found to be universal across all projects studied.

About this research paper

What this paper is about

The use of construction manager–general contractor (CM-GC) project delivery is gaining momentum with highway projects across the United States. This project delivery process is different from the traditional design–bid–build (D-B-B) process in that an agency works with one CM-GC to develop the construction cost. To ensure that agencies receive fair market value, many agencies employ an independent cost estimator (ICE) in lieu of competitive bidding. The findings of a research effort to explore ICE roles, responsibilities, and best practices within highway construction are presented. The findings were derived through a review of previous literature, current agency CM-GC ICE policies, surveys of 25 completed CM-GC projects, and in-depth interviews with highway agency officials on six of the projects. The six projects were selected for interviews from the set of completed projects to allow for cross-case comparison. Although multiple best practices are identified, the two key findings of the research are that the ICE should have construction experience and local knowledge and should be an involved team member throughout the design process. In summary, all of the reviewed agencies found the ICE role to be essential in establishing a competitive construction contract cost and thereby gaining value through early contractor involvement. Some agencies found that the ICE added value beyond the costing process as a team member throughout design, but this practice was not found to be universal across all projects studied.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The use of construction manager–general contractor (CM-GC) project delivery is gaining momentum with highway projects across the United States. This project delivery process is different from the traditional design–bid–build (D-B-B) process in that an agency works with one CM-GC to develop the construction cost. To ensure that agencies receive fair market value, many agencies employ an independent cost estimator (ICE) in lieu of competitive bidding. The findings of a research effort to explore ICE roles, responsibilities, and best practices within highway construction are presented. The findings were derived through a review of previous literature, current agency CM-GC ICE policies, surveys of 25 completed CM-GC projects, and in-depth interviews with highway agency officials on six of the projects. The six projects were selected for interviews from the set of completed projects to allow for cross-case comparison. Although multiple best practices are identified, the two key findings of the research are that the ICE should have construction experience and local knowledge and should be an involved team member throughout the design process. In summary, all of the reviewed agencies found the ICE role to be essential in establishing a competitive construction contract cost and thereby gaining value through early contractor involvement. Some agencies found that the ICE added value beyond the costing process as a team member throughout design, but this practice was not found to be universal across all projects studied.

Key concepts: Integrated project delivery, Construction management, Bidding, Agency (philosophy), Value engineering, Business, Process (computing), Project team

Related papers

Back to paper searchBrowse research topicsOriginal source
Roles and Responsibilities of Independent Cost Estimator in Construction Manager–General Contractor Highway Construction — Research Paper | ScholarLens