Case Study of Construction Project Delivery Types

William J. Bender

Open publisher page 7 citations

Abstract

Two separate construction projects that used different delivery methods and were managed for the owner by a part time construction professional are presented. One project used the classic design, bid, then build by using a low bid lump sum contract for construction. The second project selected a contractor during the design phase based on reputation and ability to perform the work. A negotiated Guaranteed Maximum Price (GMP) contract for construction was used for the second project. The author is a construction management professor and was the owners representative for these projects. The paper also briefly discusses efficient and prudent measures to ensure a successful endeavor when construction educators are working as a part-time construction management consultant.

About this research paper

What this paper is about

Two separate construction projects that used different delivery methods and were managed for the owner by a part time construction professional are presented. One project used the classic design, bid, then build by using a low bid lump sum contract for construction. The second project selected a contractor during the design phase based on reputation and ability to perform the work. A negotiated Guaranteed Maximum Price (GMP) contract for construction was used for the second project. The author is a construction management professor and was the owners representative for these projects. The paper also briefly discusses efficient and prudent measures to ensure a successful endeavor when construction educators are working as a part-time construction management consultant.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Two separate construction projects that used different delivery methods and were managed for the owner by a part time construction professional are presented. One project used the classic design, bid, then build by using a low bid lump sum contract for construction. The second project selected a contractor during the design phase based on reputation and ability to perform the work. A negotiated Guaranteed Maximum Price (GMP) contract for construction was used for the second project. The author is a construction management professor and was the owners representative for these projects. The paper also briefly discusses efficient and prudent measures to ensure a successful endeavor when construction educators are working as a part-time construction management consultant.

Key concepts: Integrated project delivery, Pre-construction services, Reputation, Construction management, Work (physics), Construction industry, Contract management, Construction contract