2016•Polish Maritime ResearchOpen access

Muck Problems in Subway Shield Tunneling in Sandy Cobble Stratum

Kai Cui, Weikang Lin

Open full text 14 citations

Abstract

Abstract Experiments aiming at the muck improvement for Chengdu’s subway shield tunneling in water-rich sandy cobble ground initially finds out the kinds and ratio of muck improver suitable for the this strata, and through the field application determines the reasonable ratio of muck improver for shield tunneling in sandy cobble ground, providing a reference to other muck improvement for shied tunneling in similar ground. And the earth pressure balanced shield is widely used in tunnel engineering, with its characteristics as wide adaptability, safe operation, fast driving speed, low environmental noise and low cost. Taking Chengdu Metro Line as the background, aiming at the difficulty faced by EPB shield tunneling in water-rich sandy cobble ground, and based on the explorations and researches of the predecessors and scholars, engineering and technical personnel, the present paper combines with engineering examples to make a systematic summary and research on key construction technology of EPB shield tunneling through sandy cobble ground from the aspects of EPB shield adaptability, , structure and transformation of cutter and helical unearthed wares, settlement control method, and muck improvement measures. It has certain reference value and guiding significance to the selection of shield machine and the reconstruction of shield machine in complex geological condition.

Open-access reader

About this research paper

What this paper is about

Abstract Experiments aiming at the muck improvement for Chengdu’s subway shield tunneling in water-rich sandy cobble ground initially finds out the kinds and ratio of muck improver suitable for the this strata, and through the field application determines the reasonable ratio of muck improver for shield tunneling in sandy cobble ground, providing a reference to other muck improvement for shied tunneling in similar ground. And the earth pressure balanced shield is widely used in tunnel engineering, with its characteristics as wide adaptability, safe operation, fast driving speed, low environmental noise and low cost. Taking Chengdu Metro Line as the background, aiming at the difficulty faced by EPB shield tunneling in water-rich sandy cobble ground, and based on the explorations and researches of the predecessors and scholars, engineering and technical personnel, the present paper combines with engineering examples to make a systematic summary and research on key construction technology of EPB shield tunneling through sandy cobble ground from the aspects of EPB shield adaptability, , structure and transformation of cutter and helical unearthed wares, settlement control method, and muck improvement measures. It has certain reference value and guiding significance to the selection of shield machine and the reconstruction of shield machine in complex geological condition.

Why it matters

OpenAlex reports 14 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Experiments aiming at the muck improvement for Chengdu’s subway shield tunneling in water-rich sandy cobble ground initially finds out the kinds and ratio of muck improver suitable for the this strata, and through the field application determines the reasonable ratio of muck improver for shield tunneling in sandy cobble ground, providing a reference to other muck improvement for shied tunneling in similar ground. And the earth pressure balanced shield is widely used in tunnel engineering, with its characteristics as wide adaptability, safe operation, fast driving speed, low environmental noise and low cost. Taking Chengdu Metro Line as the background, aiming at the difficulty faced by EPB shield tunneling in water-rich sandy cobble ground, and based on the explorations and researches of the predecessors and scholars, engineering and technical personnel, the present paper combines with engineering examples to make a systematic summary and research on key construction technology of EPB shield tunneling through sandy cobble ground from the aspects of EPB shield adaptability, , structure and transformation of cutter and helical unearthed wares, settlement control method, and muck improvement measures. It has certain reference value and guiding significance to the selection of shield machine and the reconstruction of shield machine in complex geological condition.

Key concepts: Muck, Cobble, Shield, Geotechnical engineering, Adaptability, Engineering, Mining engineering, Tunnel boring machine

Related papers

Back to paper searchBrowse research topicsOriginal source
Muck Problems in Subway Shield Tunneling in Sandy Cobble Stratum — Research Paper | ScholarLens