1993Engineering HydrologyRequires access

Reservoir Regulation and Real-Time Models for Trinity River Flood Prevention and Control

Troy Lynn Lovell, J. Russell Killen, Bill S. Eichert

Open publisher page 0 citations

Abstract

After unprecedented flooding from the Spring of 1989 through 1991 in the Trinity River basin, the Texas legislature allocated funds for flood related studies in Senate Bill 1543 (1991). Subsequently, the Texas Water Commission, in conjunction with the Trinity River Authority, retained Albert H. Halff Associates to study possible alternative system-wide reservoir operation schemes, and to develop the key technical elements of a real-time flood forecasting system for the Trinity River basin. The objectives of the reservoir operation study were to prepare a basin-wide reservoir simulation model for existing reservoir operating conditions, verify the model with observed historical reservoir operation data, and evaluate the effectiveness of several basin-wide operation scenarios on controlling flooding in the Trinity River basin. The real-time system study involved development of an integrated network of flood data acquisition components and computer models, intended to facilitate the forecasting of basin-wide flood flows during a flood event.

About this research paper

What this paper is about

After unprecedented flooding from the Spring of 1989 through 1991 in the Trinity River basin, the Texas legislature allocated funds for flood related studies in Senate Bill 1543 (1991). Subsequently, the Texas Water Commission, in conjunction with the Trinity River Authority, retained Albert H. Halff Associates to study possible alternative system-wide reservoir operation schemes, and to develop the key technical elements of a real-time flood forecasting system for the Trinity River basin. The objectives of the reservoir operation study were to prepare a basin-wide reservoir simulation model for existing reservoir operating conditions, verify the model with observed historical reservoir operation data, and evaluate the effectiveness of several basin-wide operation scenarios on controlling flooding in the Trinity River basin. The real-time system study involved development of an integrated network of flood data acquisition components and computer models, intended to facilitate the forecasting of basin-wide flood flows during a flood event.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

After unprecedented flooding from the Spring of 1989 through 1991 in the Trinity River basin, the Texas legislature allocated funds for flood related studies in Senate Bill 1543 (1991). Subsequently, the Texas Water Commission, in conjunction with the Trinity River Authority, retained Albert H. Halff Associates to study possible alternative system-wide reservoir operation schemes, and to develop the key technical elements of a real-time flood forecasting system for the Trinity River basin. The objectives of the reservoir operation study were to prepare a basin-wide reservoir simulation model for existing reservoir operating conditions, verify the model with observed historical reservoir operation data, and evaluate the effectiveness of several basin-wide operation scenarios on controlling flooding in the Trinity River basin. The real-time system study involved development of an integrated network of flood data acquisition components and computer models, intended to facilitate the forecasting of basin-wide flood flows during a flood event.

Key concepts: Flood control, Flood myth, Structural basin, Hydrology (agriculture), Flood forecasting, Flooding (psychology), HEC-HMS, Drainage basin

Related papers

Back to paper searchBrowse research topicsOriginal source
Reservoir Regulation and Real-Time Models for Trinity River Flood Prevention and Control — Research Paper | ScholarLens