Optimization Design on Boiler-turbine Coordinated Control System with Automatic Generation Control

Han Zhong-xu, Huanpao Huang, Zhang Zhi, Ying Sun

Open publisher page 5 citations

Abstract

Automatic generation control (AGC) is an essential requirement of modern power system automatic control. At present, slow response to AGC load demand is a serious problem existing in thermal power units taking part in AGC, which makes the control performance of power system AGC poor. The unit one and unit two of Yaomeng Power Co. Ltd., are all once-through boiler, its boiler-turbine coordinated control system (CCS) is based on incremental state observer combined with conventional PID control, and the connection logic of CCS with AGC adopted the scheme shown in this paper. Through adopting the connection logic of CCS with AGC, the pre-add coal function can be realized in AGC mode, which assured the rapid response to AGC load demand of the power unit, and this viewpoint has been fully proved by the trend curves of AGC adjusting test of the two units.

About this research paper

What this paper is about

Automatic generation control (AGC) is an essential requirement of modern power system automatic control. At present, slow response to AGC load demand is a serious problem existing in thermal power units taking part in AGC, which makes the control performance of power system AGC poor. The unit one and unit two of Yaomeng Power Co. Ltd., are all once-through boiler, its boiler-turbine coordinated control system (CCS) is based on incremental state observer combined with conventional PID control, and the connection logic of CCS with AGC adopted the scheme shown in this paper. Through adopting the connection logic of CCS with AGC, the pre-add coal function can be realized in AGC mode, which assured the rapid response to AGC load demand of the power unit, and this viewpoint has been fully proved by the trend curves of AGC adjusting test of the two units.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Automatic generation control (AGC) is an essential requirement of modern power system automatic control. At present, slow response to AGC load demand is a serious problem existing in thermal power units taking part in AGC, which makes the control performance of power system AGC poor. The unit one and unit two of Yaomeng Power Co. Ltd., are all once-through boiler, its boiler-turbine coordinated control system (CCS) is based on incremental state observer combined with conventional PID control, and the connection logic of CCS with AGC adopted the scheme shown in this paper. Through adopting the connection logic of CCS with AGC, the pre-add coal function can be realized in AGC mode, which assured the rapid response to AGC load demand of the power unit, and this viewpoint has been fully proved by the trend curves of AGC adjusting test of the two units.

Key concepts: Automatic Generation Control, Boiler (water heating), Electric power system, Control system, Engineering, Control theory (sociology), Control engineering, Load following power plant