Optimization Design on Boiler-turbine Coordinated Control System with Automatic Generation Control
Han Zhong-xu, Huanpao Huang, Zhang Zhi, Ying Sun
Abstract
Han Zhong-xu, Huanpao Huang, Zhang Zhi, Ying Sun
Abstract
Automatic generation control (AGC) is an essential requirement of modern power system automatic control. At present, slow response to AGC load demand is a serious problem existing in thermal power units taking part in AGC, which makes the control performance of power system AGC poor. The unit one and unit two of Yaomeng Power Co. Ltd., are all once-through boiler, its boiler-turbine coordinated control system (CCS) is based on incremental state observer combined with conventional PID control, and the connection logic of CCS with AGC adopted the scheme shown in this paper. Through adopting the connection logic of CCS with AGC, the pre-add coal function can be realized in AGC mode, which assured the rapid response to AGC load demand of the power unit, and this viewpoint has been fully proved by the trend curves of AGC adjusting test of the two units.
OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Automatic generation control (AGC) is an essential requirement of modern power system automatic control. At present, slow response to AGC load demand is a serious problem existing in thermal power units taking part in AGC, which makes the control performance of power system AGC poor. The unit one and unit two of Yaomeng Power Co. Ltd., are all once-through boiler, its boiler-turbine coordinated control system (CCS) is based on incremental state observer combined with conventional PID control, and the connection logic of CCS with AGC adopted the scheme shown in this paper. Through adopting the connection logic of CCS with AGC, the pre-add coal function can be realized in AGC mode, which assured the rapid response to AGC load demand of the power unit, and this viewpoint has been fully proved by the trend curves of AGC adjusting test of the two units.
Key concepts: Automatic Generation Control, Boiler (water heating), Electric power system, Control system, Engineering, Control theory (sociology), Control engineering, Load following power plant