First year operating experience with a 1 t/h CO2 absorption : Pilot plant at Esbjerg coal-fired power plant
Jacob Nygaard Knudsen, Pout-Jacob Vilhelmsen, Jargen Nørklit Jensen, Ole Biede
Abstract
Jacob Nygaard Knudsen, Pout-Jacob Vilhelmsen, Jargen Nørklit Jensen, Ole Biede
Abstract
As part of the EU integrated project CASRTOR, a 1 CO 2 absorption pilot plant has been erected at the 400 MW coal-fired Esbierg power plant. The main purpose of the pilot plant is to demonstrate the post-combustion capture technology in conjunction with a coal-fired power plant. In January-February 2006, a 1000 hours test compaign on a conventional solvent, 30%-weight MEA solution, was conducted at the pilot plant. This paper summarises the initial operation experience and some of the first results obtained during the 1000 hours MEA campaign
OpenAlex reports 30 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As part of the EU integrated project CASRTOR, a 1 CO 2 absorption pilot plant has been erected at the 400 MW coal-fired Esbierg power plant. The main purpose of the pilot plant is to demonstrate the post-combustion capture technology in conjunction with a coal-fired power plant. In January-February 2006, a 1000 hours test compaign on a conventional solvent, 30%-weight MEA solution, was conducted at the pilot plant. This paper summarises the initial operation experience and some of the first results obtained during the 1000 hours MEA campaign
Key concepts: Pilot plant, Power station, Coal fired power plant, Waste management, Coal, Pilot test, Environmental science, Coal fired