As part of the EU project CASTOR, a 1 t/h CO2 absorption pilot plant has been erected at Esbjergværket (Esbjerg power station) in Denmark. The main purpose of the pilot plant is to demonstrate the post combustion capture technology in conjunction with a coal-fired power station. Additionally, the pilot plant has been used to test the performance of new energy efficient solvents and to validate modelling work. The pilot plant operates on a slipstream of flue gas from the power plant without any further pre- treatment. During the CASTOR project, four 1000-hours test campaigns have been conducted at the facility using conventional solvent, 30%-weight MEA as well as two novel amine-based solvents, CASTOR 1 and CASTOR 2. Among others, the test campaigns consisted of parameter variation tests and longer periods of continuous operation. This paper summarises the operation experience and some of the results obtained during the CASTOR project.
OpenAlex reports 335 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As part of the EU project CASTOR, a 1 t/h CO2 absorption pilot plant has been erected at Esbjergværket (Esbjerg power station) in Denmark. The main purpose of the pilot plant is to demonstrate the post combustion capture technology in conjunction with a coal-fired power station. Additionally, the pilot plant has been used to test the performance of new energy efficient solvents and to validate modelling work. The pilot plant operates on a slipstream of flue gas from the power plant without any further pre- treatment. During the CASTOR project, four 1000-hours test campaigns have been conducted at the facility using conventional solvent, 30%-weight MEA as well as two novel amine-based solvents, CASTOR 1 and CASTOR 2. Among others, the test campaigns consisted of parameter variation tests and longer periods of continuous operation. This paper summarises the operation experience and some of the results obtained during the CASTOR project.
Key concepts: Flue gas, Pilot plant, Power station, Amine gas treating, Waste management, Coal fired power plant, Coal, Pilot test