This bridge structure is designed as twin bridge of total length 1.40km, the structure has only two expansion joints in its length. Each bridge structure is designed as precast concrete girder with 29 and 30 spans. Three methods of casting were designed for this project, symmetrical cantilevers (part 3); stationary (part 1) and movable scaffolding system (part 2 and 4). The cross section of part 1,2 and 4 is double “T” beam, part 3 is box girder. Because of shortage of time all parts of structure had to be built together. Construction of the bridge has started in December 2014, the main prestressed concrete superstructure should be finished until December 2016 and all remaining works should be finalized in 2017.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This bridge structure is designed as twin bridge of total length 1.40km, the structure has only two expansion joints in its length. Each bridge structure is designed as precast concrete girder with 29 and 30 spans. Three methods of casting were designed for this project, symmetrical cantilevers (part 3); stationary (part 1) and movable scaffolding system (part 2 and 4). The cross section of part 1,2 and 4 is double “T” beam, part 3 is box girder. Because of shortage of time all parts of structure had to be built together. Construction of the bridge has started in December 2014, the main prestressed concrete superstructure should be finished until December 2016 and all remaining works should be finalized in 2017.
Key concepts: Precast concrete, Bridge (graph theory), Structural engineering, Beam bridge, Box girder, Engineering, Section (typography), Cantilever