2016IEEE Transactions on Sustainable EnergyRequires access

Novel Multi-Stage Stochastic DG Investment Planning with Recourse

Sérgio F. Santos, Desta Z. Fitiwi, Abebe W. Bizuayehu, Miadreza Shafie‐khah, M. Asensio, Javier Contreras, Carlos M. P. Cabrita, João P. S. Catalào

Open publisher page 83 citations

Abstract

This paper presents a novel multi-stage stochastic distributed generation investment planning model for making investment decisions under uncertainty. The problem, formulated from a coordinated system planning viewpoint, simultaneously minimizes the net present value of costs rated to losses, emission, operation, and maintenance, as well as the cost of unserved energy. The formulation is anchored on a two-period planning horizon, each having multiple stages. The first period is a short-term horizon in which robust decisions are pursued in the face of uncertainty; whereas, the second one spans over a medium to long-term horizon involving exploratory and/or flexible investment decisions. The operational variability and uncertainty introduced by intermittent generation sources, electricity demand, emission prices, demand growth, and others are accounted for via probabilistic and stochastic methods, respectively. Metrics such as cost of ignoring uncertainty and value of perfect information are used to clearly demonstrate the benefits of the proposed stochastic model. A real-life distribution network system is used as a case study and the results show the effectiveness of the proposed model.

About this research paper

What this paper is about

This paper presents a novel multi-stage stochastic distributed generation investment planning model for making investment decisions under uncertainty. The problem, formulated from a coordinated system planning viewpoint, simultaneously minimizes the net present value of costs rated to losses, emission, operation, and maintenance, as well as the cost of unserved energy. The formulation is anchored on a two-period planning horizon, each having multiple stages. The first period is a short-term horizon in which robust decisions are pursued in the face of uncertainty; whereas, the second one spans over a medium to long-term horizon involving exploratory and/or flexible investment decisions. The operational variability and uncertainty introduced by intermittent generation sources, electricity demand, emission prices, demand growth, and others are accounted for via probabilistic and stochastic methods, respectively. Metrics such as cost of ignoring uncertainty and value of perfect information are used to clearly demonstrate the benefits of the proposed stochastic model. A real-life distribution network system is used as a case study and the results show the effectiveness of the proposed model.

Why it matters

OpenAlex reports 83 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents a novel multi-stage stochastic distributed generation investment planning model for making investment decisions under uncertainty. The problem, formulated from a coordinated system planning viewpoint, simultaneously minimizes the net present value of costs rated to losses, emission, operation, and maintenance, as well as the cost of unserved energy. The formulation is anchored on a two-period planning horizon, each having multiple stages. The first period is a short-term horizon in which robust decisions are pursued in the face of uncertainty; whereas, the second one spans over a medium to long-term horizon involving exploratory and/or flexible investment decisions. The operational variability and uncertainty introduced by intermittent generation sources, electricity demand, emission prices, demand growth, and others are accounted for via probabilistic and stochastic methods, respectively. Metrics such as cost of ignoring uncertainty and value of perfect information are used to clearly demonstrate the benefits of the proposed stochastic model. A real-life distribution network system is used as a case study and the results show the effectiveness of the proposed model.

Key concepts: Time horizon, Stochastic programming, Probabilistic logic, Investment (military), Term (time), Net present value, Horizon, Stochastic modelling

Related papers

Back to paper searchBrowse research topicsOriginal source
Novel Multi-Stage Stochastic DG Investment Planning with Recourse — Research Paper | ScholarLens