2011Unpublished venueRequires access

Environmental impact assessment for Phu Ly city subproject : appendices

Nguyễn Thị Hương Giang

Open publisher page 0 citations

Abstract

The development objective of the Medium Cities Development Project for Vietnam is to increase access to improved urban infrastructure services in three selected medium sized cities, Lao Cai, Phu Ly, and Vinh, in a sustainable and efficient manner. Some of the negative impacts and mitigation measures include: (1) exposed soil and material stockpiles shall be protected against wind erosion and the location of stockpiles shall take into consideration the prevailing wind directions and locations of sensitive receptors; (2) all vehicles must comply with Vietnamese regulations controlling allowable emission limits of exhaust gases; (3) avoiding or minimizing transportation though community areas and avoiding as well as material processing areas (such as cement mixing); (4) wastewater over standards set by relevant Vietnam technical standards and regulations must be collected in a conservancy tank and removed from site by licensed waste collectors; (5) to avoid sediment-laded runoff that can adversely affect watercourses, install sediment control structures where needed to slow or redirect runoff, and trap sediment until vegetation is established; (6) before construction, all necessary waste disposal permits or licenses must be obtained; and (7) avoid material transportation for construction during rush hour.

About this research paper

What this paper is about

The development objective of the Medium Cities Development Project for Vietnam is to increase access to improved urban infrastructure services in three selected medium sized cities, Lao Cai, Phu Ly, and Vinh, in a sustainable and efficient manner. Some of the negative impacts and mitigation measures include: (1) exposed soil and material stockpiles shall be protected against wind erosion and the location of stockpiles shall take into consideration the prevailing wind directions and locations of sensitive receptors; (2) all vehicles must comply with Vietnamese regulations controlling allowable emission limits of exhaust gases; (3) avoiding or minimizing transportation though community areas and avoiding as well as material processing areas (such as cement mixing); (4) wastewater over standards set by relevant Vietnam technical standards and regulations must be collected in a conservancy tank and removed from site by licensed waste collectors; (5) to avoid sediment-laded runoff that can adversely affect watercourses, install sediment control structures where needed to slow or redirect runoff, and trap sediment until vegetation is established; (6) before construction, all necessary waste disposal permits or licenses must be obtained; and (7) avoid material transportation for construction during rush hour.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The development objective of the Medium Cities Development Project for Vietnam is to increase access to improved urban infrastructure services in three selected medium sized cities, Lao Cai, Phu Ly, and Vinh, in a sustainable and efficient manner. Some of the negative impacts and mitigation measures include: (1) exposed soil and material stockpiles shall be protected against wind erosion and the location of stockpiles shall take into consideration the prevailing wind directions and locations of sensitive receptors; (2) all vehicles must comply with Vietnamese regulations controlling allowable emission limits of exhaust gases; (3) avoiding or minimizing transportation though community areas and avoiding as well as material processing areas (such as cement mixing); (4) wastewater over standards set by relevant Vietnam technical standards and regulations must be collected in a conservancy tank and removed from site by licensed waste collectors; (5) to avoid sediment-laded runoff that can adversely affect watercourses, install sediment control structures where needed to slow or redirect runoff, and trap sediment until vegetation is established; (6) before construction, all necessary waste disposal permits or licenses must be obtained; and (7) avoid material transportation for construction during rush hour.

Key concepts: Surface runoff, Environmental science, Vietnamese, Environmental engineering, Environmental planning, Environmental protection, Biology, Ecology

Related papers

Back to paper searchBrowse research topicsOriginal source
Environmental impact assessment for Phu Ly city subproject : appendices — Research Paper | ScholarLens