Environmental management plan for 500KV Tay Ha Noi substation subproject

Hoa Chau Nguyen

Open publisher page 0 citations

Abstract

The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. Some of the negative impacts and mitigation measures include: (1) exposed soil and material stockpiles shall be protected against wind erosion and the location of stockpiles shall take into consideration the prevailing wind directions and locations of sensitive receptors; (2) all vehicles must comply with Vietnamese regulations controlling allowable emission limits of exhaust gases; (3) avoiding or minimizing transportation through or processing material in community areas (like concrete mixing); (4) wastewater over standards set by relevant Vietnam technical standards and regulations must be collected in a conservancy tank and removed from site by licensed waste collectors; (5) measures shall be taken to reduce the potential for litter and negligent behavior with regard to the disposal of all refuse; (6) used oil and grease shall be removed from site and sold to an approved used oil recycling company; and (7) place signs around the construction areas to facilitate traffic movement, provide directions to various components of the works, and provide safety advice and warning.

About this research paper

What this paper is about

The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. Some of the negative impacts and mitigation measures include: (1) exposed soil and material stockpiles shall be protected against wind erosion and the location of stockpiles shall take into consideration the prevailing wind directions and locations of sensitive receptors; (2) all vehicles must comply with Vietnamese regulations controlling allowable emission limits of exhaust gases; (3) avoiding or minimizing transportation through or processing material in community areas (like concrete mixing); (4) wastewater over standards set by relevant Vietnam technical standards and regulations must be collected in a conservancy tank and removed from site by licensed waste collectors; (5) measures shall be taken to reduce the potential for litter and negligent behavior with regard to the disposal of all refuse; (6) used oil and grease shall be removed from site and sold to an approved used oil recycling company; and (7) place signs around the construction areas to facilitate traffic movement, provide directions to various components of the works, and provide safety advice and warning.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. Some of the negative impacts and mitigation measures include: (1) exposed soil and material stockpiles shall be protected against wind erosion and the location of stockpiles shall take into consideration the prevailing wind directions and locations of sensitive receptors; (2) all vehicles must comply with Vietnamese regulations controlling allowable emission limits of exhaust gases; (3) avoiding or minimizing transportation through or processing material in community areas (like concrete mixing); (4) wastewater over standards set by relevant Vietnam technical standards and regulations must be collected in a conservancy tank and removed from site by licensed waste collectors; (5) measures shall be taken to reduce the potential for litter and negligent behavior with regard to the disposal of all refuse; (6) used oil and grease shall be removed from site and sold to an approved used oil recycling company; and (7) place signs around the construction areas to facilitate traffic movement, provide directions to various components of the works, and provide safety advice and warning.

Key concepts: Environmental science, Electricity, Business, Waste management, Environmental protection, Engineering, Environmental planning, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Environmental management plan for 500KV Tay Ha Noi substation subproject — Research Paper | ScholarLens