The Ten Construction Characteristics of the Roller Compacted Concrete Gravity Dam of the Gelantan Hydropower Project

Deng Shan-xiang

Open publisher page 0 citations

Abstract

The paper has summed up the ten characteristics of the construction of Gelantan hydropower project in terms of use of materials,quarrying,aggregate processing system production technology,concrete placement,temperature control measures,overflow face concrete placement,roller compacted concrete placement of inclined layer,slip formwork installation,construction method of roller compacted concrete gravity dam and construction management.That is why the roller compacted concrete dam,113m in max.height,could basically be completed within a period of 19 months.

About this research paper

What this paper is about

The paper has summed up the ten characteristics of the construction of Gelantan hydropower project in terms of use of materials,quarrying,aggregate processing system production technology,concrete placement,temperature control measures,overflow face concrete placement,roller compacted concrete placement of inclined layer,slip formwork installation,construction method of roller compacted concrete gravity dam and construction management.That is why the roller compacted concrete dam,113m in max.height,could basically be completed within a period of 19 months.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper has summed up the ten characteristics of the construction of Gelantan hydropower project in terms of use of materials,quarrying,aggregate processing system production technology,concrete placement,temperature control measures,overflow face concrete placement,roller compacted concrete placement of inclined layer,slip formwork installation,construction method of roller compacted concrete gravity dam and construction management.That is why the roller compacted concrete dam,113m in max.height,could basically be completed within a period of 19 months.

Key concepts: Roller-compacted concrete, Formwork, Hydropower, Geotechnical engineering, Gravity dam, Engineering, Civil engineering, Cement