2008•Hubei Water PowerRequires access

Simulation research on construction course of Longkaikou Roller Compacted Concrete Gravity Dam

Yihong Zhou

Open publisher page 3 citations

Abstract

Aiming at the construction characteristics of the dam at Longkaikou Hydropower Plant,under the boundary conditions of the construction diversion scheme,the dam structure,the dam concrete compartment and the concrete temperature control measures in the construction period,etc.,this paper synthetically considers the construction procedure for concrete of dam,the resources bound and the system motion characteristics;systematically analyzes the transport and store methods of roller compacted concrete,the storehouse surface programme and the effect of varied concrete property;and establishes the dynamic simulation model for the overall construction process of roller compacted concrete dam.By means of the analogue of construction process for Longkaikou Roller Compacted Concrete Dam,the comprehensive and detailed construction process parameters and state informations of concrete of dam are obtained.

About this research paper

What this paper is about

Aiming at the construction characteristics of the dam at Longkaikou Hydropower Plant,under the boundary conditions of the construction diversion scheme,the dam structure,the dam concrete compartment and the concrete temperature control measures in the construction period,etc.,this paper synthetically considers the construction procedure for concrete of dam,the resources bound and the system motion characteristics;systematically analyzes the transport and store methods of roller compacted concrete,the storehouse surface programme and the effect of varied concrete property;and establishes the dynamic simulation model for the overall construction process of roller compacted concrete dam.By means of the analogue of construction process for Longkaikou Roller Compacted Concrete Dam,the comprehensive and detailed construction process parameters and state informations of concrete of dam are obtained.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Aiming at the construction characteristics of the dam at Longkaikou Hydropower Plant,under the boundary conditions of the construction diversion scheme,the dam structure,the dam concrete compartment and the concrete temperature control measures in the construction period,etc.,this paper synthetically considers the construction procedure for concrete of dam,the resources bound and the system motion characteristics;systematically analyzes the transport and store methods of roller compacted concrete,the storehouse surface programme and the effect of varied concrete property;and establishes the dynamic simulation model for the overall construction process of roller compacted concrete dam.By means of the analogue of construction process for Longkaikou Roller Compacted Concrete Dam,the comprehensive and detailed construction process parameters and state informations of concrete of dam are obtained.

Key concepts: Gravity dam, Roller-compacted concrete, Hydropower, Engineering, Civil engineering, Geotechnical engineering, Process (computing), Boundary (topology)

Related papers

Back to paper searchBrowse research topicsOriginal source
Simulation research on construction course of Longkaikou Roller Compacted Concrete Gravity Dam — Research Paper | ScholarLens