2005Yellow RiverRequires access

Process Regulation of Runoff and Sediment of the Yellow River and Shaping Normal Channel of the Lower Reaches

Chen Xu-jian

Open publisher page 0 citations

Abstract

Along with the variations by a big margin of coming water and sediment and intensification of human activities in the Yellow River basin, the physical conditions of the Yellow River are increasingly worse. The paper puts forward cognition on sediment discharge regulation system of the Yellow River and considers that a normal channel with about 4000 m3/s bankfull discharge could be created through the regulation of the Xiaolangdi Reservoir and 5~8 years effort of the channel on the lower Yellow River under the present actual conditions of sediment discharge of the river, through the studies on aspects of connotation of the river’s health, theory and technical support for keeping the healthy life of the river, mathematical model of sediment water resources optimized configuration of the basin, sediment reduction function on the lower river channel of joint operation of large-scale key water control works and creating a normal channel on the lower Yellow River.

About this research paper

What this paper is about

Along with the variations by a big margin of coming water and sediment and intensification of human activities in the Yellow River basin, the physical conditions of the Yellow River are increasingly worse. The paper puts forward cognition on sediment discharge regulation system of the Yellow River and considers that a normal channel with about 4000 m3/s bankfull discharge could be created through the regulation of the Xiaolangdi Reservoir and 5~8 years effort of the channel on the lower Yellow River under the present actual conditions of sediment discharge of the river, through the studies on aspects of connotation of the river’s health, theory and technical support for keeping the healthy life of the river, mathematical model of sediment water resources optimized configuration of the basin, sediment reduction function on the lower river channel of joint operation of large-scale key water control works and creating a normal channel on the lower Yellow River.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Along with the variations by a big margin of coming water and sediment and intensification of human activities in the Yellow River basin, the physical conditions of the Yellow River are increasingly worse. The paper puts forward cognition on sediment discharge regulation system of the Yellow River and considers that a normal channel with about 4000 m3/s bankfull discharge could be created through the regulation of the Xiaolangdi Reservoir and 5~8 years effort of the channel on the lower Yellow River under the present actual conditions of sediment discharge of the river, through the studies on aspects of connotation of the river’s health, theory and technical support for keeping the healthy life of the river, mathematical model of sediment water resources optimized configuration of the basin, sediment reduction function on the lower river channel of joint operation of large-scale key water control works and creating a normal channel on the lower Yellow River.

Key concepts: Sediment, Channel (broadcasting), Hydrology (agriculture), Drainage basin, Surface runoff, Environmental science, Structural basin, Water resources

Related papers

Back to paper searchBrowse research topicsOriginal source
Process Regulation of Runoff and Sediment of the Yellow River and Shaping Normal Channel of the Lower Reaches — Research Paper | ScholarLens