2004Shanxi ArchitectureRequires access

Discussion on the investment control of construction project

Jie Zhao

Open publisher page 0 citations

Abstract

Combined with practical experiences in this paper according to various stages of construction project corresponding investment control measures are proposed in order to reduce input to require maximum economic return.

About this research paper

What this paper is about

Combined with practical experiences in this paper according to various stages of construction project corresponding investment control measures are proposed in order to reduce input to require maximum economic return.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combined with practical experiences in this paper according to various stages of construction project corresponding investment control measures are proposed in order to reduce input to require maximum economic return.

Key concepts: Control (management), Investment (military), Risk analysis (engineering), Business, Economics, Political science, Management, Politics

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on the investment control of construction project — Research Paper | ScholarLens