Exploration continuous box girder casting technique of prestressed concrete
Yang Zheng-yua
Abstract
Yang Zheng-yua
Abstract
Integrating with continuous box girder casting case of the prestressed concrete,movable cradle is used in the engineering construction.Concrete is poured on the beam section by section with the pier as the center.This paper puts forward the prestressed post-tension construction method of continuous box girder and matters needing attention in the construction,which has provided guidance for similar engineering.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Integrating with continuous box girder casting case of the prestressed concrete,movable cradle is used in the engineering construction.Concrete is poured on the beam section by section with the pier as the center.This paper puts forward the prestressed post-tension construction method of continuous box girder and matters needing attention in the construction,which has provided guidance for similar engineering.
Key concepts: Box girder, Pier, Prestressed concrete, Engineering, Tension (geology), Structural engineering, Girder, Casting