Probe into the Construction Techniques of Prestressed Concrete Box Girder
Qiao Jian-hu
Abstract
Qiao Jian-hu
Abstract
This paper introduces the construction techniques of the box girder bottom-formwork making,steel bar handling,and concrete casting,etc.,and expounds the applications of these techniques in the two box girder bridges in the 10th contract section of Changhan Superhighway.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper introduces the construction techniques of the box girder bottom-formwork making,steel bar handling,and concrete casting,etc.,and expounds the applications of these techniques in the two box girder bridges in the 10th contract section of Changhan Superhighway.
Key concepts: Formwork, Box girder, Engineering, Structural engineering, Casting, Prestressed concrete, Bar (unit), Girder