Due to the factors such as water resources utilization,the water level is lower than the flood control level during the actual operation process in some reservoirs before the flood season in most years,which indicates that the flood regulation level is lower than the design value,and therefore the flood storage capacity is increased and the flood regulation ability is improved.Based on the probability of the occurrence of the design flood control level,the flood control level is determined.Moreover,the approach of that the regulation level is lower than the design flood control level is used to adjust the design flood and then reduce the dam height according to the probability analysis.For the existing reservoirs,increasing the flood control level is analyzed to increase the flood regulation and storage capacity,which can help determine the more economic design and operation scheme on the basis of the engineering safety.

About this research paper

What this paper is about

Due to the factors such as water resources utilization,the water level is lower than the flood control level during the actual operation process in some reservoirs before the flood season in most years,which indicates that the flood regulation level is lower than the design value,and therefore the flood storage capacity is increased and the flood regulation ability is improved.Based on the probability of the occurrence of the design flood control level,the flood control level is determined.Moreover,the approach of that the regulation level is lower than the design flood control level is used to adjust the design flood and then reduce the dam height according to the probability analysis.For the existing reservoirs,increasing the flood control level is analyzed to increase the flood regulation and storage capacity,which can help determine the more economic design and operation scheme on the basis of the engineering safety.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Due to the factors such as water resources utilization,the water level is lower than the flood control level during the actual operation process in some reservoirs before the flood season in most years,which indicates that the flood regulation level is lower than the design value,and therefore the flood storage capacity is increased and the flood regulation ability is improved.Based on the probability of the occurrence of the design flood control level,the flood control level is determined.Moreover,the approach of that the regulation level is lower than the design flood control level is used to adjust the design flood and then reduce the dam height according to the probability analysis.For the existing reservoirs,increasing the flood control level is analyzed to increase the flood regulation and storage capacity,which can help determine the more economic design and operation scheme on the basis of the engineering safety.

Key concepts: Flood myth, Flood control, Water level, 100-year flood, Environmental science, Hydrology (agriculture), Control (management), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion of Probability and Statistical Methods in the Design and Application of Flood Control Level in Reservoirs — Research Paper | ScholarLens