2014Anhui nongye kexueRequires access

Research on Flood Routing of Huangbaihe River Cascade Reservoir

Yin Zhi-yua

Open publisher page 0 citations

Abstract

Flood control level is set in order to coordinate the conflict between reservoir flood control and benefit and make the hydropower station economic operating under the premise of security. According to the series of problems exposed in the design flood control level of Huangbaihe River Cascade Reservoirs in practical control application,this paper reviewed the flood control level and provided a theoretical basis for scientific flood control and benefit of reservoirs. The calculation results show that the design flood control level of Huangbaihe River cascade reservoirs is a little higher. It's appropriate to increase the storage capacity of reservoir for improving the economic benefit.

About this research paper

What this paper is about

Flood control level is set in order to coordinate the conflict between reservoir flood control and benefit and make the hydropower station economic operating under the premise of security. According to the series of problems exposed in the design flood control level of Huangbaihe River Cascade Reservoirs in practical control application,this paper reviewed the flood control level and provided a theoretical basis for scientific flood control and benefit of reservoirs. The calculation results show that the design flood control level of Huangbaihe River cascade reservoirs is a little higher. It's appropriate to increase the storage capacity of reservoir for improving the economic benefit.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Flood control level is set in order to coordinate the conflict between reservoir flood control and benefit and make the hydropower station economic operating under the premise of security. According to the series of problems exposed in the design flood control level of Huangbaihe River Cascade Reservoirs in practical control application,this paper reviewed the flood control level and provided a theoretical basis for scientific flood control and benefit of reservoirs. The calculation results show that the design flood control level of Huangbaihe River cascade reservoirs is a little higher. It's appropriate to increase the storage capacity of reservoir for improving the economic benefit.

Key concepts: Flood control, Cascade, Hydropower, Flood myth, Routing (electronic design automation), Hydrology (agriculture), Water resource management, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Flood Routing of Huangbaihe River Cascade Reservoir — Research Paper | ScholarLens