Study on flood control storage capacity of Xiajiang Reservoir in Ganjiang River
Tang Zhixian
Abstract
Tang Zhixian
Abstract
According to the comprehensive planning of flood control projects in the mid-lower Ganjiang River,considering the combination of flood control storage capacity of Xiajiang Reservoir and flood storage capacity of Quangang flood diversion-detention area,we draw up two flood regulation schemes: the reservoir and flood diversion-detention area jointly operate for flood control;the reservoir controls the flood coming from the upper stream of Xiajiang hydropower project,while the flood diversion-detention area is only used for the diverting and storing the flood yielded in the downstream area of the dam.Through flood routing for 8-year-types' design flood,the flood control and diversion-detention storage capacities of the two schemes are obtained.Scheme 1 is selected through comprehensive comparison,which can fully use the existed structure measures,reduces the inundation area without additional investment,and meet the requirement of downstream flood control.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the comprehensive planning of flood control projects in the mid-lower Ganjiang River,considering the combination of flood control storage capacity of Xiajiang Reservoir and flood storage capacity of Quangang flood diversion-detention area,we draw up two flood regulation schemes: the reservoir and flood diversion-detention area jointly operate for flood control;the reservoir controls the flood coming from the upper stream of Xiajiang hydropower project,while the flood diversion-detention area is only used for the diverting and storing the flood yielded in the downstream area of the dam.Through flood routing for 8-year-types' design flood,the flood control and diversion-detention storage capacities of the two schemes are obtained.Scheme 1 is selected through comprehensive comparison,which can fully use the existed structure measures,reduces the inundation area without additional investment,and meet the requirement of downstream flood control.
Key concepts: Flood myth, Flood control, Environmental science, Hydropower, Hydrology (agriculture), Floodplain, Detention basin, Water resource management