Design and construction techniques of retaining structures under railways running across foundation pits

Fang Ji

Open publisher page 0 citations

Abstract

The foundation pit of Shanghai South Railway Station is constructed under the condition of running railway across it.During the construction process,some key construction techniques are adopted to ensure the running of the railway without stop and to reduce,decreasing the deformation of the railway subgrade and retaining structures.For continuous construction,many technical measures are used,including subdivision of construction units,available deformation observation et al.The key construction techniques can be adopted by other similar projects.

About this research paper

What this paper is about

The foundation pit of Shanghai South Railway Station is constructed under the condition of running railway across it.During the construction process,some key construction techniques are adopted to ensure the running of the railway without stop and to reduce,decreasing the deformation of the railway subgrade and retaining structures.For continuous construction,many technical measures are used,including subdivision of construction units,available deformation observation et al.The key construction techniques can be adopted by other similar projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The foundation pit of Shanghai South Railway Station is constructed under the condition of running railway across it.During the construction process,some key construction techniques are adopted to ensure the running of the railway without stop and to reduce,decreasing the deformation of the railway subgrade and retaining structures.For continuous construction,many technical measures are used,including subdivision of construction units,available deformation observation et al.The key construction techniques can be adopted by other similar projects.

Key concepts: Subgrade, Foundation (evidence), Engineering, Civil engineering, Key (lock), Deformation (meteorology), Subdivision, Road construction

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and construction techniques of retaining structures under railways running across foundation pits — Research Paper | ScholarLens