2010Shanxi ArchitectureRequires access

Application of 7-part excavation process method in Yanmenguan tunnel

Chang Yong-ji

Open publisher page 0 citations

Abstract

Taking the successful application of excavation working method in a tunnel excavation as an example,it analyzes the basic principle,formation conditions,and the applicability of 7-part excavation process method,discusses its construction technology from the initial support construction,and concrete lining and other aspects,which has accumulated useful experience for soft rock construction.

About this research paper

What this paper is about

Taking the successful application of excavation working method in a tunnel excavation as an example,it analyzes the basic principle,formation conditions,and the applicability of 7-part excavation process method,discusses its construction technology from the initial support construction,and concrete lining and other aspects,which has accumulated useful experience for soft rock construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking the successful application of excavation working method in a tunnel excavation as an example,it analyzes the basic principle,formation conditions,and the applicability of 7-part excavation process method,discusses its construction technology from the initial support construction,and concrete lining and other aspects,which has accumulated useful experience for soft rock construction.

Key concepts: Excavation, Process (computing), Engineering, Construction engineering, Geotechnical engineering, Mining engineering, Civil engineering, Forensic engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Application of 7-part excavation process method in Yanmenguan tunnel — Research Paper | ScholarLens