Construction Technology Research of Feng-Tong Highway Tunnel
Cui Jian-a
Abstract
Cui Jian-a
Abstract
The article described the construction technique of the tunnel,and determined the supporting methods and key technologies of tunnel excavation.By introducing respectively the tunnel and tunnel construction method,the article emphatically introduces the tunnel shallow soil or sloughing of soft surrounding rock section of tunnel excavating and the specific plan,method,construction procedure of class IV and V grade surrounding rock section excavation work;Introduces advanced support measures in long pipe shed and ahead of a small pipe,advance anchor bolt construction method.On matters of attention in the construction are illustrated.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The article described the construction technique of the tunnel,and determined the supporting methods and key technologies of tunnel excavation.By introducing respectively the tunnel and tunnel construction method,the article emphatically introduces the tunnel shallow soil or sloughing of soft surrounding rock section of tunnel excavating and the specific plan,method,construction procedure of class IV and V grade surrounding rock section excavation work;Introduces advanced support measures in long pipe shed and ahead of a small pipe,advance anchor bolt construction method.On matters of attention in the construction are illustrated.
Key concepts: Excavation, Engineering, Section (typography), Tunnel construction, Railway tunnel, Plan (archaeology), Geotechnical engineering, Civil engineering