Study on Way to Operation of BT Model Using in Constructing Urban Rail Transit
Li‐Ming Yang
Abstract
Li‐Ming Yang
Abstract
Different type of investment and financing,construction and management models are needed during the developing urban rail transit at top speed.BT(buildtransfer) model can release government financial stress,knock down construction cost,accelerate construction speed,and promote general adoption of the market principle in urban rail transit.It has obvious goodness for constructing medium scale urban rail transit.Based on the experience at home and abroad,presents the way to operation,applicability,merits using BT model during constructing urban rail transit.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Different type of investment and financing,construction and management models are needed during the developing urban rail transit at top speed.BT(buildtransfer) model can release government financial stress,knock down construction cost,accelerate construction speed,and promote general adoption of the market principle in urban rail transit.It has obvious goodness for constructing medium scale urban rail transit.Based on the experience at home and abroad,presents the way to operation,applicability,merits using BT model during constructing urban rail transit.
Key concepts: Urban rail transit, Transport engineering, Transit (satellite), Investment (military), Urban rail, Rail transit, Government (linguistics), Business