2011Central China Electric PowerRequires access

Transformation of Air Preheater of No.3 Boiler in Yaomeng Power Plant

Deng Chao-xu

Open publisher page 0 citations

Abstract

The No.3 boiler in Yaomeng Power Plant comes with Hood rotary type air preheater,since operation,the air leakage rate of air preheater is rather high,it influences the boiler efficiency and the safe operation.After the extensive study and discussion,Hood rotary type air preheater is transformed into Ljungstrom Regenerative Air Heater.The structure and the parameters of the transformed air preheater are displayed in this paper,problems and experience during the process of installation are also explained,the economy of the air preheater before and after transformation are compared,which offers a reference to the transformation of the air preheater in the same type.

About this research paper

What this paper is about

The No.3 boiler in Yaomeng Power Plant comes with Hood rotary type air preheater,since operation,the air leakage rate of air preheater is rather high,it influences the boiler efficiency and the safe operation.After the extensive study and discussion,Hood rotary type air preheater is transformed into Ljungstrom Regenerative Air Heater.The structure and the parameters of the transformed air preheater are displayed in this paper,problems and experience during the process of installation are also explained,the economy of the air preheater before and after transformation are compared,which offers a reference to the transformation of the air preheater in the same type.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The No.3 boiler in Yaomeng Power Plant comes with Hood rotary type air preheater,since operation,the air leakage rate of air preheater is rather high,it influences the boiler efficiency and the safe operation.After the extensive study and discussion,Hood rotary type air preheater is transformed into Ljungstrom Regenerative Air Heater.The structure and the parameters of the transformed air preheater are displayed in this paper,problems and experience during the process of installation are also explained,the economy of the air preheater before and after transformation are compared,which offers a reference to the transformation of the air preheater in the same type.

Key concepts: Air preheater, Boiler (water heating), Power station, Engineering, Waste management, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Transformation of Air Preheater of No.3 Boiler in Yaomeng Power Plant — Research Paper | ScholarLens