2005Electric PowerRequires access

Analysis on air preheater of boiler No.5 in Shajiao A Power Plant

YE Wei-qing

Open publisher page 0 citations

Abstract

The 1 025 t/h boiler was originally equipped with a round-belt-driven Ljungstorm tri-sector regenerative air preheater in Shajiao A Power Plant. The air leakage rate was high since the air preheater was commissioned and affected boiler safe and economic operation. A center-driven tri-sector air heater with a clearance adjuster was adopted to replace the original air preheater. The structure and parameters of the new air preheater are introduced with the problems and experience met in the replacement. The economy of the air preheater before and after reform is also introduced. The total investment of the reform was RMB 1.45 million yuan and it is expected to pay off in 3.29 years. The reform in this power plant may be a reference for the reform of the same type air preheaters.

About this research paper

What this paper is about

The 1 025 t/h boiler was originally equipped with a round-belt-driven Ljungstorm tri-sector regenerative air preheater in Shajiao A Power Plant. The air leakage rate was high since the air preheater was commissioned and affected boiler safe and economic operation. A center-driven tri-sector air heater with a clearance adjuster was adopted to replace the original air preheater. The structure and parameters of the new air preheater are introduced with the problems and experience met in the replacement. The economy of the air preheater before and after reform is also introduced. The total investment of the reform was RMB 1.45 million yuan and it is expected to pay off in 3.29 years. The reform in this power plant may be a reference for the reform of the same type air preheaters.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The 1 025 t/h boiler was originally equipped with a round-belt-driven Ljungstorm tri-sector regenerative air preheater in Shajiao A Power Plant. The air leakage rate was high since the air preheater was commissioned and affected boiler safe and economic operation. A center-driven tri-sector air heater with a clearance adjuster was adopted to replace the original air preheater. The structure and parameters of the new air preheater are introduced with the problems and experience met in the replacement. The economy of the air preheater before and after reform is also introduced. The total investment of the reform was RMB 1.45 million yuan and it is expected to pay off in 3.29 years. The reform in this power plant may be a reference for the reform of the same type air preheaters.

Key concepts: Air preheater, Boiler (water heating), Power station, Engineering, Waste management, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source