2003•Driuing Fluid and Completion FluldRequires access

Some problems in deep well cementing

Xie Chengbin

Open publisher page 1 citations

Abstract

This paper discusses some problems in deep well cementing including the newest ISO standard method to measure the top compressive strength of long segment cement, cementing temperature, slim an- nular cementing, rheological tests on drilling and cementing fluids, cement sheath shrinkage and cementing engineering design. Cement sheath and casing corrosion by drilling fluid and completion fluid, plugging in deep well, low density cement slurry system in ultra-high temperature cementing are also involved.

About this research paper

What this paper is about

This paper discusses some problems in deep well cementing including the newest ISO standard method to measure the top compressive strength of long segment cement, cementing temperature, slim an- nular cementing, rheological tests on drilling and cementing fluids, cement sheath shrinkage and cementing engineering design. Cement sheath and casing corrosion by drilling fluid and completion fluid, plugging in deep well, low density cement slurry system in ultra-high temperature cementing are also involved.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper discusses some problems in deep well cementing including the newest ISO standard method to measure the top compressive strength of long segment cement, cementing temperature, slim an- nular cementing, rheological tests on drilling and cementing fluids, cement sheath shrinkage and cementing engineering design. Cement sheath and casing corrosion by drilling fluid and completion fluid, plugging in deep well, low density cement slurry system in ultra-high temperature cementing are also involved.

Key concepts: Casing, Drilling fluid, Cement, Shrinkage, Petroleum engineering, Drilling, Geotechnical engineering, Slurry

Related papers

Back to paper searchBrowse research topicsOriginal source
Some problems in deep well cementing — Research Paper | ScholarLens